Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
1storm overflows within 2 km
26hours of spills in 2025 between them (typical neighbourhood: about 36)
8spill events counted
Anglian Water
Selbourne Avenue Pumping Stationinto Newton Longville Brook8 spills, 26 hours in 2025
New-home postcodes with fewer than 5 homes are counted above but not listed. 17 postcodes nearby had new homes completed in the last two years.
Battery storage
Watling Street - Micro Energy StorageApproved, not yet built · 200 kW
Aug 2025 3.7 km away
Rooftop solar
Delico, Steinbeck Crescent - Solar PanelsApproved, not yet built · 2 MW
Apr 2023 3.8 km away
Running nearest: Bletchley Phase II (landfill gas, 1.8 km); Red Bull Racing, Bradbourne Drive - Solar Panels (rooftop solar, 5.2 km); Red Bull Ford Powertrains, Rindt Building, Bradbourne Drive – Solar Panels (rooftop solar, 5.4 km); The Hazeley Academy (rooftop solar, 7.1 km); Double Arches Quarry Wind Turbine (wind farm, 7.7 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Airports · The existing site of London Luton Airport
decided Apr 2025 27.5 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.