Country England and Wales › Region South East › Council Milton Keynes › Neighbourhood Bletchley East › Postcode MK2 2PR What's changing near MK2 2PR Within 2 km, around Bletchley East in Milton Keynes. Building, planning, schools, transport, prices and crime.
215 new homes completed within 2 km, last 2 years
0 homes given permission on brownfield sites since 2021
+4.5% like-for-like prices in Bletchley East, 2024 → 2025 (council +1.3%)
+9% recorded crime, last 12 months vs the 12 before
On the map
New homes School opened Extended home Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 15 new homes completed flats · Mar 2026
Mar 2026 1.9 km away New homes 15 new homes completed flats · Mar 2026
Mar 2026 1.9 km away New homes 7 new homes completed houses · Nov 2024 – Feb 2026
Feb 2026 1.8 km away New homes 8 new homes completed 6 flats, 2 houses · Sep 2025 – Feb 2026
Feb 2026 1.6 km away New homes 16 new homes completed flats · Feb 2026
Feb 2026 1.9 km away New homes 19 new homes completed flats · Feb 2026
Feb 2026 1.9 km away New homes 6 new homes completed houses · Oct 2025 – Jan 2026
Jan 2026 1.8 km away New homes 12 new homes completed houses · May 2025 – Dec 2025
Dec 2025 1.7 km away New homes 27 new homes completed houses · Dec 2024 – Dec 2025
Dec 2025 1.8 km away New homes 16 new homes completed houses · Sep 2025
Oct 2025 1.7 km away New homes 6 new homes completed flats · Oct 2025
Oct 2025 1.7 km away New homes 6 new homes completed flats · Oct 2025
Oct 2025 1.7 km away New homes 13 homes extended 2021–2025, typically adding 24 m²
23 since energy certificates began (2008)
1 in MK2 2PR itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 68 planned, approved or being built and 14 running (45 MW between them). Those within 5 km are on the map above.
Battery storage Dukes Drive, Princes Way - Micro Energy Storage Approved, not yet built · 200 kW
Mar 2025 550 m away Rooftop solar Unit 2, Watling Street - Solar Panels Approved, not yet built · 230 kW
Jul 2024 650 m away Rooftop solar Sensient Flavours, Bilton Road - Solar Panels Approved, not yet built · 470 kW
May 2023 700 m away Battery storage Belvedere Lane, Watling Street - Micro Energy Storage Planning application in · 200 kW
Apr 2026 1000 m away Rooftop solar Third Avenue, Bletchley - Solar Panels Approved, not yet built · 230 kW
Nov 2025 1.0 km away Rooftop solar The Premier Academy, Saffron Street - Solar Panels Approved, not yet built
Dec 2025 1.1 km away Rooftop solar Dawson Road, Bletchley - Solar Photovoltaic Panels Planning application in · 260 kW
Oct 2021 1.3 km away Rooftop solar Dawson Road, Bletchley - Solar Panels Approved, not yet built · 280 kW
Aug 2022 1.3 km away Rooftop solar Dawson Rentals Vans, Dawson Road - Solar Carport Canopy & BESS Approved, not yet built · 260 kW
May 2024 1.3 km away Battery storage Watling Street - Micro Energy Storage Approved, not yet built · 200 kW
Aug 2025 1.3 km away Road and street works within 1 km 10 permitted works running now or planned, 4 of them major.
Major, planned Brooklands Road, Bletchley Highway repair and maintenance works · MILTON KEYNES COUNCIL · Road closure
Oct 2026 to Oct 2026 650 m away Major Brooklands Road, Bletchley Highway repair and maintenance works · MILTON KEYNES COUNCIL · Road closure
Oct 2026 to Oct 2026 650 m away Major Queensway, Bletchley Highway improvement works · MILTON KEYNES COUNCIL · Road closure
Jan 2026 to Nov 2026 700 m away Major Oliver Road, Bletchley Highway improvement works · MILTON KEYNES COUNCIL · Road closure
May 2026 to Nov 2026 800 m away Minor Queensway, Bletchley Highway repair and maintenance works · MILTON KEYNES COUNCIL · Multi-way signals
Oct 2026 to Oct 2026 400 m away Minor Saxon Street H10 To Princes Way, Milton Keynes Highway repair and maintenance works · MILTON KEYNES COUNCIL · Lane closure
Oct 2026 to Oct 2026 600 m away Minor Simpson Road, Bletchley Highway repair and maintenance works · MILTON KEYNES COUNCIL · Some carriageway incursion
Oct 2026 to Oct 2026 650 m away Minor Manor Road, Bletchley Highway repair and maintenance works · MILTON KEYNES COUNCIL · Multi-way signals
Oct 2026 to Oct 2026 700 m away Minor Princes Way Roundabout, Milton Keynes Highway repair and maintenance works · MILTON KEYNES COUNCIL · Lane closure
Oct 2026 to Oct 2026 750 m away Major infrastructure projects within 30 km Decided Millbrook Power Generating Stations · The Rookery Pit Near Stewartby, Bedfordshire decided Mar 2019 15.1 km away Decided decided Oct 2011 15.7 km away Recommendation Rosefield Solar Farm Generating Stations · Four land parcels to the south and west of the East Claydon substation, Bucks. application due September 2025 17.9 km away Decided decided Sept 2014 18.3 km away Decided decided Oct 2019 24.2 km away Decided decided Oct 2013 26.2 km away Decided Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Red Bull Racing, Bradbourne Drive - Solar Panels (rooftop solar, 2.4 km); Red Bull Ford Powertrains, Rindt Building, Bradbourne Drive – Solar Panels (rooftop solar, 2.6 km); Bletchley Phase II (landfill gas, 3.6 km); Blum Uk - Solar Panels (rooftop solar, 5.3 km); Falcon Project (battery storage, 5.3 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.