Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
Midway Centre, Harding Road - Solar PanelsApproved, not yet built · 530 kW
Jul 2023 3.3 km away
Battery storage
Hammerwood Gate, By University Roundabout - Micro Energy StorageApproved, not yet built · 200 kW
Jan 2026 3.4 km away
Running nearest: Red Bull Ford Powertrains, Rindt Building, Bradbourne Drive – Solar Panels (rooftop solar, 1000 m); Red Bull Racing, Bradbourne Drive - Solar Panels (rooftop solar, 1000 m); Blum Uk - Solar Panels (rooftop solar, 4.3 km); Harvie Card Way - Solar panels (rooftop solar, 4.7 km); Goosey Lodge Industrial Estate (biomass, 6.0 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Airports · The existing site of London Luton Airport
decided Apr 2025 25.5 km away
Decided
Green Hill Solar FarmGenerating Stations · Land to the south and west of Wellingborough and north of Northampton.
decided Oct 2026 26.9 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.