Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
1storm overflows within 2 km
274hours of spills in 2025 between them (typical neighbourhood: about 36)
23spill events counted
Anglian Water
Woburn Stw (Ps Only As Of 01/04/90)into Crawlwy Brook River Ouzel Nt23 spills, 274 hours in 2025
Hammerwood Gate, By University Roundabout - Micro Energy StorageApproved, not yet built · 200 kW
Jan 2026 4.4 km away
Rooftop solar
Prologis DC4 Marston Gate, Brockley Way - Solar PanelsApproved, not yet built · 350 kW
May 2024 4.6 km away
Running nearest: Red Bull Ford Powertrains, Rindt Building, Bradbourne Drive – Solar Panels (rooftop solar, 3.0 km); Red Bull Racing, Bradbourne Drive - Solar Panels (rooftop solar, 3.1 km); Goosey Lodge Industrial Estate (biomass, 3.6 km); Harvie Card Way - Solar panels (rooftop solar, 3.6 km); Blum Uk - Solar Panels (rooftop solar, 4.5 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
decided Oct 2019 26.4 km away
Decided
Green Hill Solar FarmGenerating Stations · Land to the south and west of Wellingborough and north of Northampton.
decided Oct 2026 26.6 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.