Country England and Wales › Region South East › Council Buckinghamshire › Neighbourhood Granborough, Stewkley & Great Brickhill › Postcode MK17 0SW What's changing near MK17 0SW Within 2 km, around Granborough, Stewkley & Great Brickhill in Buckinghamshire. Building, planning, schools, transport, prices and crime.
1 new homes completed within 2 km, last 2 years
0 homes given permission on brownfield sites since 2021
+3.2% like-for-like prices in Granborough, Stewkley & Great Brickhill, 2024 → 2025 (council +2.0%)
-3% recorded crime, last 12 months vs the 12 before
On the map
New homes Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first No new homes (5+ in a postcode), planning permissions or school changes recorded within 2 km.
New-home postcodes with fewer than 5 homes are counted above but not listed. 1 postcodes nearby had new homes completed in the last two years.
0 homes extended 2021–2025
0 since energy certificates began (2008)
0 in MK17 0SW itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km 1 storm overflows within 2 km
341 hours of spills in 2025 between them (typical neighbourhood: about 36)
23 spill events counted
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 20 planned, approved or being built and 7 running (116 MW between them). Those within 5 km are on the map above.
Solar farm Wood End, Mursley Road Approved, not yet built · 36 MW
Dec 2022 3.2 km away Solar farm Longbreach Solar Farm Planning application in · 50 MW
Jun 2025 4.5 km away Solar farm Tuckey Farm Approved, not yet built · 25 MW
Apr 2021 4.8 km away Battery storage East Claydon Battery Energy Storage Approved, not yet built · 500 MW
Sept 2025 4.8 km away Battery storage East Claydon Substation, East Claydon Road - Energy Storage Planning application in · 500 MW
Apr 2025 5.8 km away Rooftop solar Delico, Steinbeck Crescent - Solar Panels Approved, not yet built · 2 MW
Apr 2023 6.4 km away Rooftop solar Pendeen Crescent, Snelshall East - Solar panels Planning application in · 1 MW
Apr 2024 6.9 km away Rooftop solar DHL Supply Chain, Pendeen Crescent -Solar Panels Approved, not yet built · 1 MW
Jul 2024 7.1 km away Rooftop solar Faccenda Foods, Wellington Farm - Solar Array Planning application in · 150 kW
Jan 2025 7.2 km away Rooftop solar Pitchcott Hill Farm, Pitchcott Hill - Solar Panels Approved, not yet built · 170 kW
Mar 2025 7.4 km away Solar farm
Road and street works within 1 km 3 permitted works running now or planned.
Standard Winslow Road, Swanbourne Statutory Infrastructure Works · CITYFIBRE METRO NETWORKS LTD · Multi-way signals
Nov 2026 to Dec 2026 50 m away Standard Mursley Road, Swanbourne Statutory Infrastructure Works · CITYFIBRE METRO NETWORKS LTD · Multi-way signals
Dec 2026 to Dec 2026 400 m away Minor Ridgeway Cottages, Swanbourne Statutory Infrastructure Works · CITYFIBRE METRO NETWORKS LTD · Some carriageway incursion
Nov 2026 to Nov 2026 700 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Recommendation Rosefield Solar Farm Generating Stations · Four land parcels to the south and west of the East Claydon substation, Bucks. application due September 2025 7.8 km away Decided decided Sept 2014 23.6 km away Decided Millbrook Power Generating Stations · The Rookery Pit Near Stewartby, Bedfordshire decided Mar 2019 25.2 km away Decided decided Oct 2011 25.8 km away Examination application due March 2026 26.4 km away Decided decided Oct 2019 27.6 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Fox Covert Solar Farm (battery storage, 4.9 km); Fox Covert Solar Farm (solar farm, 5.0 km); Bletchley Phase II (landfill gas, 6.7 km); Land At Potash Farm (solar farm, 8.8 km); Stony Energy Storage Facility (battery storage, 9.0 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.