What's changing near MK17 0DD
Within 2 km, around Newton Longville & Great Horwood in Buckinghamshire. Building, planning, schools, transport, prices and crime.
42new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+8.2%like-for-like prices in Newton Longville & Great Horwood, 2024 → 2025 (council +2.0%)
-9%recorded crime, last 12 months vs the 12 before
On the map
New homesExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
6 new homes completedhouses · Feb 2026 – Sep 2026
Sept 2026
1.7 km away - New homes
13 new homes completedhouses · Nov 2025 – Aug 2026
Aug 2026
1.7 km away - New homes
6 new homes completedhouses · Mar 2026 – May 2026
May 2026
1.7 km away - New homes
5 new homes completedhouses · Mar 2026
Mar 2026
1.8 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 10 postcodes nearby had new homes completed in the last two years.
6homes extended 2021–2025, typically adding 44 m²
9since energy certificates began (2008)
1in MK17 0DD itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
1storm overflows within 2 km
119hours of spills in 2025 between them (typical neighbourhood: about 36)
21spill events counted
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
55 planned, approved or being built and 13 running (121 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Delico, Steinbeck Crescent - Solar PanelsApproved, not yet built · 2 MW
Apr 2023
2.3 km away - Rooftop solar
Pendeen Crescent, Snelshall East - Solar panelsPlanning application in · 1 MW
Apr 2024
2.4 km away - Rooftop solar
DHL Supply Chain, Pendeen Crescent -Solar PanelsApproved, not yet built · 1 MW
Jul 2024
2.5 km away - Battery storage
Strangford Drive, Drayton Road - Micro Energy Storage FacilityApproved, not yet built · 200 kW
Jan 2026
3.1 km away - Battery storage
Strangford Drive, Skene Close - Micro Energy Storage FacilityApproved, not yet built · 200 kW
Jan 2026
3.1 km away - Rooftop solar
Sir Herbert Leon Academy - Solar PanelsApproved, not yet built · 200 kW
Apr 2021
3.3 km away - Rooftop solar
The Premier Academy, Saffron Street - Solar PanelsApproved, not yet built
Dec 2025
3.8 km away - Battery storage
Dukes Drive, Princes Way - Micro Energy StorageApproved, not yet built · 200 kW
Mar 2025
4.0 km away - Rooftop solar
Third Avenue, Bletchley - Solar PanelsApproved, not yet built · 230 kW
Nov 2025
4.4 km away - Battery storage
Watling Street - Micro Energy StorageApproved, not yet built · 200 kW
Aug 2025
4.5 km away
Road and street works within 1 km
No road or street works with a permit running now or planned within 1 km (England; permits granted up to the end of September 2026).
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Recommendation
Rosefield Solar FarmGenerating Stations · Four land parcels to the south and west of the East Claydon substation, Bucks. application due September 2025
13.5 km away - Decided
Millbrook PowerGenerating Stations · The Rookery Pit Near Stewartby, Bedfordshire decided Mar 2019
19.5 km away - Decideddecided Sept 2014
20.0 km away - Decideddecided Oct 2011
20.1 km away - Decideddecided Oct 2019
25.4 km away - Decideddecided Oct 2013
27.5 km away - Decided
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Bletchley Phase II (landfill gas, 1.0 km); The Hazeley Academy (rooftop solar, 6.0 km); Red Bull Racing, Bradbourne Drive - Solar Panels (rooftop solar, 6.8 km); Red Bull Ford Powertrains, Rindt Building, Bradbourne Drive – Solar Panels (rooftop solar, 7.0 km); Falcon Project (battery storage, 7.8 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.