Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
1storm overflows within 2 km
119hours of spills in 2025 between them (typical neighbourhood: about 36)
21spill events counted
Anglian Water
Newton Longville-Whaddon Road Psinto Trib Newton Longville Brook21 spills, 119 hours in 2025
Unit 2, Watling Street - Solar PanelsApproved, not yet built · 230 kW
Jul 2024 4.7 km away
Solar farm
Wood End, Mursley RoadApproved, not yet built · 36 MW
Dec 2022 5.0 km away
Running nearest: Bletchley Phase II (landfill gas, 1000 m); The Hazeley Academy (rooftop solar, 6.0 km); Red Bull Racing, Bradbourne Drive - Solar Panels (rooftop solar, 6.8 km); Red Bull Ford Powertrains, Rindt Building, Bradbourne Drive – Solar Panels (rooftop solar, 7.0 km); Falcon Project (battery storage, 7.8 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Airports · The existing site of London Luton Airport
decided Apr 2025 29.4 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.