Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
2storm overflows within 2 km
146hours of spills in 2025 between them (typical neighbourhood: about 36)
15spill events counted
Anglian Water
Willen Road Psinto River Ouzel13 spills, 129 hours in 2025
600 m away
Anglian Water
Cotton Valley Water Recycling Ctrinto River Great Ouse/River Ouzel2 spills, 16 hours in 2025
Rosefield Solar FarmGenerating Stations · Four land parcels to the south and west of the East Claydon substation, Bucks.
application due September 2025 25.0 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Newport Pagnell South: +17% over five years (2020 → 2025).
Council tax list: 0 homes added in the neighbourhood since April 2024.
Population (GP registrations): -1.5% in two years.