Country England and Wales › Region South East › Council Milton Keynes › Neighbourhood Newport Pagnell South › Postcode MK16 8YU What's changing near MK16 8YU Within 2 km, around Newport Pagnell South in Milton Keynes. Building, planning, schools, transport, prices and crime.
112 new homes completed within 2 km, last 2 years
0 homes given permission on brownfield sites since 2021
+0.4% like-for-like prices in Newport Pagnell South, 2024 → 2025 (council +1.3%)
+13% recorded crime, last 12 months vs the 12 before
On the map
New homes Extended home Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 8 new homes completed houses · Apr 2026 – Oct 2026
Oct 2026 1.5 km away New homes 17 new homes completed houses · Dec 2025 – Oct 2026
Oct 2026 1.5 km away New homes 6 new homes completed houses · Nov 2025 – Aug 2026
Aug 2026 1.6 km away New homes 13 new homes completed 2 flats, 11 houses · Mar 2026 – Aug 2026
Aug 2026 1.5 km away New homes 5 new homes completed houses · May 2026 – Aug 2026
Aug 2026 1.5 km away New homes 48 new homes completed 45 flats, 3 houses · Apr 2026 – Jul 2026
Jul 2026 550 m away New homes 14 new homes completed houses · Jan 2026 – Jun 2026
Jun 2026 1.6 km away New-home postcodes with fewer than 5 homes are counted above but not listed. 8 postcodes nearby had new homes completed in the last two years.
10 homes extended 2021–2025, typically adding 25 m²
17 since energy certificates began (2008)
1 in MK16 8YU itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km 2 storm overflows within 2 km
146 hours of spills in 2025 between them (typical neighbourhood: about 36)
15 spill events counted
Anglian Water Willen Road Ps into River Ouzel 13 spills, 129 hours in 2025
900 m away Anglian Water Cotton Valley Water Recycling Ctr into River Great Ouse/River Ouzel 2 spills, 16 hours in 2025
1.4 km away Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 55 planned, approved or being built and 20 running (92 MW between them). Those within 5 km are on the map above.
Rooftop solar Caldecote Farm - Storage & Distribution Unit Being built · 260 kW
Apr 2024 1.7 km away Rooftop solar Tanners Drive, Blakelands - Solar Panels Approved, not yet built · 200 kW
Sept 2023 1.9 km away Battery storage Wolverton Road, Giffard Park Roundabout - Micro Energy Storage Planning application in · 200 kW
Feb 2025 1.9 km away Battery storage Yeomans Drive, Blakelands - Micro Energy Storage Facility Approved, not yet built · 200 kW
Mar 2025 2.1 km away Rooftop solar Delaware Drive, Tongwell - Solar Panels Approved, not yet built · 470 kW
Nov 2024 2.1 km away Rooftop solar Mercedes Benz UK - Solar array car port Approved, not yet built · 2 MW
Sept 2021 2.7 km away Battery storage St Leger Drive, Great Linford - Micro Energy Storage Facility Approved, not yet built · 200 kW
Feb 2025 3.2 km away Rooftop solar Northfield Drive, Northfield - Solar Panles Approved, not yet built · 750 kW
Mar 2022 3.9 km away Rooftop solar David Lloyd, Livingstone Drive - Solar Panels Approved, not yet built · 560 kW
Nov 2023 3.9 km away Battery storage Northfield Drive, Tongwell Street - Micro Energy Storage System Approved, not yet built · 200 kW
Feb 2025 4.0 km away Road and street works within 1 km 1 permitted works running now or planned.
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided Millbrook Power Generating Stations · The Rookery Pit Near Stewartby, Bedfordshire decided Mar 2019 14.0 km away Decided decided Oct 2011 14.3 km away Decided decided Oct 2019 16.7 km away Decided Green Hill Solar Farm Generating Stations · Land to the south and west of Wellingborough and north of Northampton. decided Oct 2026 17.3 km away Decided decided Sept 2014 24.9 km away Recommendation Rosefield Solar Farm Generating Stations · Four land parcels to the south and west of the East Claydon substation, Bucks. application due September 2025 25.1 km away Recommendation Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: The Kickles (solar farm, 1.8 km); Milton Keynes Wind Farm (wind farm, 5.5 km); Blum Uk - Solar Panels (rooftop solar, 5.6 km); Rectory Farm/Emberton (solar farm, 5.8 km); Falcon Project (battery storage, 5.9 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.