Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
1storm overflows within 2 km
129hours of spills in 2025 between them (typical neighbourhood: about 36)
13spill events counted
Anglian Water
Willen Road Psinto River Ouzel13 spills, 129 hours in 2025
St Leger Drive, Great Linford - Micro Energy Storage FacilityApproved, not yet built · 200 kW
Feb 2025 3.5 km away
Battery storage
Brickhill Street, Lakeside Roundabout - Micro Energy Storage FacilityApproved, not yet built · 200 kW
Jul 2025 3.5 km away
Running nearest: The Kickles (solar farm, 3.1 km); Blum Uk - Solar Panels (rooftop solar, 4.5 km); University Way, Cranfield - Solar Array (solar farm, 5.1 km); Cranfield University - Solar Farm (solar farm, 5.3 km); Harvie Card Way - Solar panels (rooftop solar, 5.5 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Generating Stations · Land between Hail Weston and Swineshead. With grid connection to the Eaton Socon sub-station.
application due September 2025 29.9 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.