Country England and Wales › Region South East › Council Milton Keynes › Neighbourhood Great Linford & Giffard Park › Postcode MK14 5QP What's changing near MK14 5QP Within 2 km, around Great Linford & Giffard Park in Milton Keynes. Building, planning, schools, transport, prices and crime.
172 new homes completed within 2 km, last 2 years
0 homes given permission on brownfield sites since 2021
-2.1% like-for-like prices in Great Linford & Giffard Park, 2024 → 2025 (council +1.3%)
+1% recorded crime, last 12 months vs the 12 before
On the map
New homes Extended home Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 48 new homes completed 45 flats, 3 houses · Apr 2026 – Jul 2026
Jul 2026 2.0 km away New homes 5 new homes completed flats · Mar 2026
Mar 2026 2.0 km away New homes 47 new homes completed flats · Nov 2025
Nov 2025 1.8 km away New homes 65 new homes completed flats · Nov 2025
Nov 2025 1.8 km away New homes 6 new homes completed houses · Oct 2024
Oct 2024 1.3 km away New-home postcodes with fewer than 5 homes are counted above but not listed. 6 postcodes nearby had new homes completed in the last two years.
8 homes extended 2021–2025, typically adding 35 m²
15 since energy certificates began (2008)
0 in MK14 5QP itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 60 planned, approved or being built and 18 running (70 MW between them). Those within 5 km are on the map above.
Rooftop solar Tanners Drive, Blakelands - Solar Panels Approved, not yet built · 200 kW
Sept 2023 600 m away Battery storage Wolverton Road, Giffard Park Roundabout - Micro Energy Storage Planning application in · 200 kW
Feb 2025 650 m away Battery storage St Leger Drive, Great Linford - Micro Energy Storage Facility Approved, not yet built · 200 kW
Feb 2025 900 m away Battery storage Yeomans Drive, Blakelands - Micro Energy Storage Facility Approved, not yet built · 200 kW
Mar 2025 950 m away Rooftop solar Delaware Drive, Tongwell - Solar Panels Approved, not yet built · 470 kW
Nov 2024 1.5 km away Rooftop solar Mercedes Benz UK - Solar array car port Approved, not yet built · 2 MW
Sept 2021 1.7 km away Rooftop solar Linford Wood Business Park, Linford Wood - Solar Panels Approved, not yet built · 410 kW
Mar 2024 2.0 km away Rooftop solar Caldecote Farm - Storage & Distribution Unit Being built · 260 kW
Apr 2024 2.3 km away Rooftop solar David Lloyd, Livingstone Drive - Solar Panels Approved, not yet built · 560 kW
Nov 2023 2.7 km away Battery storage Brickhill Street, Lakeside Roundabout - Micro Energy Storage Facility Approved, not yet built · 200 kW
Jul 2025 2.9 km away Road and street works within 1 km No road or street works with a permit running now or planned within 1 km (England; permits granted up to the end of September 2026).
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided Millbrook Power Generating Stations · The Rookery Pit Near Stewartby, Bedfordshire decided Mar 2019 15.7 km away Decided decided Oct 2011 16.1 km away Decided decided Oct 2019 16.3 km away Decided Green Hill Solar Farm Generating Stations · Land to the south and west of Wellingborough and north of Northampton. decided Oct 2026 18.8 km away Recommendation Rosefield Solar Farm Generating Stations · Four land parcels to the south and west of the East Claydon substation, Bucks. application due September 2025 22.8 km away Decided decided Sept 2014 25.1 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: The Kickles (solar farm, 2.5 km); Falcon Project (battery storage, 3.8 km); Milton Keynes Waste Recovery Park (energy from waste, 4.5 km); Blum Uk - Solar Panels (rooftop solar, 5.6 km); Littlewood Farm (solar farm, 6.9 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.