What's changing near MK13 9HT
Within 2 km, around Bradwell Village in Milton Keynes. Building, planning, schools, transport, prices and crime.
212new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+1.2%like-for-like prices in Bradwell Village, 2024 → 2025 (council +1.3%)
+6%recorded crime, last 12 months vs the 12 before
On the map
New homesSchool openedSchool closedExtended homeEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
53 new homes completedflats · Sep 2025
Sept 2025
1.1 km away - New homes
80 new homes completedflats · Sep 2025
Sept 2025
1.5 km away - New homes
74 new homes completedflats · Mar 2025 – May 2025
May 2025
1.4 km away - New schoolJun 2023
2.0 km away - School closed
School closed: SMK Gateway - Alternative ProvisionOther independent school, other independent school (de-registered)
Aug 2022
1.9 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 8 postcodes nearby had new homes completed in the last two years.
10homes extended 2021–2025, typically adding 27 m²
16since energy certificates began (2008)
1in MK13 9HT itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
69 planned, approved or being built and 13 running (130 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Deltic Avenue, Rooksley - Solar PanelsApproved, not yet built · 260 kW
May 2024
550 m away - Battery storage
Alston Drive, Bradwell Abbey - Micro Energy Storage FacilityApproved, not yet built · 200 kW
Jul 2025
750 m away - Rooftop solar
Bradwell Road, Loughton Lodge - Solar PanelsApproved, not yet built · 520 kW
Jun 2022
800 m away - Battery storage
Bradwell Road - Micro Storage FacilityApproved, not yet built · 200 kW
Jan 2026
850 m away - Rooftop solar
Volkswagen Group UK, Garamonde Drive - Solar PanelsApproved, not yet built · 700 kW
Jan 2025
900 m away - Battery storage
The Church Of The Latterday Saints, The High Street - Battery StorageApproved, not yet built · 200 kW
Jan 2025
1.2 km away - Rooftop solar
Brioche Pasquier UK, Garamonde Drive - Solar CanopiesApproved, not yet built · 610 kW
Jan 2025
1.3 km away - Rooftop solar
Vodafone, Fingle Drive - Solar PV PanelsApproved, not yet built · 340 kW
Mar 2023
2.0 km away - Rooftop solar
Linford Wood Business Park, Linford Wood - Solar PanelsApproved, not yet built · 410 kW
Mar 2024
2.1 km away - Rooftop solar
New Bradwell School, Bounty Street - Solar PanelsApproved, not yet built
May 20262.2 km away
Road and street works within 1 km
9 permitted works running now or planned, 6 of them major.
- Major, planned
Haberley Mead, Milton KeynesUtility asset works · BT · Road closure
Dec 2026 to Dec 2026
100 m away - Major
Haberley Mead, Milton KeynesUtility asset works · BT · Road closure
Dec 2026 to Dec 2026
100 m away - Major, planned
Rawlins Road, Milton KeynesHighway repair and maintenance works · MILTON KEYNES COUNCIL · Road closure
Feb 2027 to Feb 2027
750 m away - Major
Rawlins Road, Milton KeynesHighway repair and maintenance works · MILTON KEYNES COUNCIL · Road closure
Feb 2027 to Feb 2027
750 m away - Major, planned
Grafton Street H3 To H4, Milton KeynesHighway repair and maintenance works · MILTON KEYNES COUNCIL · Road closure
Feb 2027 to Feb 2027
750 m away - Major
Grafton Street H3 To H4, Milton KeynesHighway repair and maintenance works · MILTON KEYNES COUNCIL · Road closure
Feb 2027 to Feb 2027
750 m away - Minor
Redway Bw01 Bradwell, Milton KeynesUtility asset works · BT · No carriageway incursion
Dec 2026 to Dec 2026
100 m away - Minor
Burnham Drive, Milton KeynesUtility asset works · HUTCHISON 3G LTD · No carriageway incursion
Oct 2026 to Oct 2026
800 m away - Minor
Bancroft Roundabout, Milton KeynesHighway repair and maintenance works · MILTON KEYNES COUNCIL · Lane closure
Oct 2026 to Oct 2026
950 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decideddecided Oct 2019
17.6 km away - Decided
Millbrook PowerGenerating Stations · The Rookery Pit Near Stewartby, Bedfordshire decided Mar 2019
17.8 km away - Decideddecided Oct 2011
18.3 km away - Recommendation
Rosefield Solar FarmGenerating Stations · Four land parcels to the south and west of the East Claydon substation, Bucks. application due September 2025
18.8 km away - Decided
Green Hill Solar FarmGenerating Stations · Land to the south and west of Wellingborough and north of Northampton. decided Oct 2026
22.3 km away - Decideddecided Sept 2014
24.6 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Falcon Project (battery storage, 1.7 km); Milton Keynes Waste Recovery Park (energy from waste, 3.3 km); The Hazeley Academy (rooftop solar, 3.5 km); The Kickles (solar farm, 6.3 km); Land At Potash Farm (solar farm, 6.4 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.