225new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+1.2%like-for-like prices in Bradwell Village, 2024 → 2025 (council +1.3%)
+6%recorded crime, last 12 months vs the 12 before
On the map
New homesSchool openedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
5 new homes completedflats · Mar 2026
Mar 2026
1.8 km away - New homes
9 new homes completed3 flats, 6 houses · Jul 2025 – Dec 2025
Dec 2025
1.6 km away - New homes
53 new homes completedflats · Sep 2025
Sept 2025
1.8 km away - New homes
80 new homes completedflats · Sep 2025
Sept 2025
2.0 km away - New homes
74 new homes completedflats · Mar 2025 – May 2025
May 2025
1.9 km away - New schoolJun 2023
1.8 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 9 postcodes nearby had new homes completed in the last two years.
3homes extended 2021–2025, typically adding 24 m²
11since energy certificates began (2008)
0in MK13 9DG itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
2storm overflows within 2 km
23hours of spills in 2025 between them (typical neighbourhood: about 36)
19spill events counted
- Anglian Water
Sewers In Bradwell Roadinto Loughton Brook10 spills, 19 hours in 2025
1.4 km away - Anglian Water
Wolverton Rail Freight Csointo Trib Of River Great Ouse9 spills, 5 hours in 2025
1.7 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
68 planned, approved or being built and 13 running (130 MW between them). Those within 5 km are on the map above.
- Battery storage
Alston Drive, Bradwell Abbey - Micro Energy Storage FacilityApproved, not yet built · 200 kW
Jul 2025
900 m away - Rooftop solar
Vodafone, Fingle Drive - Solar PV PanelsApproved, not yet built · 340 kW
Mar 2023
1.3 km away - Rooftop solar
Deltic Avenue, Rooksley - Solar PanelsApproved, not yet built · 260 kW
May 2024
1.3 km away - Rooftop solar
Volkswagen Group UK, Garamonde Drive - Solar PanelsApproved, not yet built · 700 kW
Jan 2025
1.3 km away - Rooftop solar
Brioche Pasquier UK, Garamonde Drive - Solar CanopiesApproved, not yet built · 610 kW
Jan 2025
1.4 km away - Rooftop solar
New Bradwell School, Bounty Street - Solar PanelsApproved, not yet built
May 2026
1.4 km away - Rooftop solar
Bradwell Road, Loughton Lodge - Solar PanelsApproved, not yet built · 520 kW
Jun 2022
1.6 km away - Battery storage
Bradwell Road - Micro Storage FacilityApproved, not yet built · 200 kW
Jan 2026
1.6 km away - Battery storage
The Church Of The Latterday Saints, The High Street - Battery StorageApproved, not yet built · 200 kW
Jan 2025
1.7 km away - Rooftop solar
Linford Wood Business Park, Linford Wood - Solar PanelsApproved, not yet built · 410 kW
Mar 20241.9 km away
Road and street works within 1 km
13 permitted works running now or planned, 8 of them major.
- Major, planned
Rawlins Road, Milton KeynesHighway repair and maintenance works · MILTON KEYNES COUNCIL · Road closure
Feb 2027 to Feb 2027
150 m away - Major
Rawlins Road, Milton KeynesHighway repair and maintenance works · MILTON KEYNES COUNCIL · Road closure
Feb 2027 to Feb 2027
150 m away - Major, planned
Grafton Street H3 To H4, Milton KeynesHighway repair and maintenance works · MILTON KEYNES COUNCIL · Road closure
Feb 2027 to Feb 2027
150 m away - Major
Grafton Street H3 To H4, Milton KeynesHighway repair and maintenance works · MILTON KEYNES COUNCIL · Road closure
Feb 2027 to Feb 2027
150 m away - Major, planned
Arncliffe Drive, Milton KeynesUtility asset works · BT · Road closure
Dec 2026 to Dec 2026
600 m away - Major
Arncliffe Drive, Milton KeynesUtility asset works · BT · Road closure
Dec 2026 to Dec 2026
600 m away - Major, planned
Haberley Mead, Milton KeynesUtility asset works · BT · Road closure
Dec 2026 to Dec 2026
700 m away - Major
Haberley Mead, Milton KeynesUtility asset works · BT · Road closure
Dec 2026 to Dec 2026
700 m away - Minor
Bancroft Roundabout, Milton KeynesHighway repair and maintenance works · MILTON KEYNES COUNCIL · Lane closure
Oct 2026 to Oct 2026
150 m away - Minor
Major infrastructure projects within 30 km
- Decideddecided Oct 2019
16.9 km away - Decided
Millbrook PowerGenerating Stations · The Rookery Pit Near Stewartby, Bedfordshire decided Mar 2019
17.9 km away - Decideddecided Oct 2011
18.4 km away - Recommendation
Rosefield Solar FarmGenerating Stations · Four land parcels to the south and west of the East Claydon substation, Bucks. application due September 2025
19.4 km away - Decided
Green Hill Solar FarmGenerating Stations · Land to the south and west of Wellingborough and north of Northampton. decided Oct 2026
21.5 km away - Decideddecided Sept 2014
25.2 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Falcon Project (battery storage, 2.2 km); Milton Keynes Waste Recovery Park (energy from waste, 2.6 km); The Hazeley Academy (rooftop solar, 4.1 km); The Kickles (solar farm, 5.7 km); Blum Uk - Solar Panels (rooftop solar, 6.7 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.