Country England and Wales › Region South East › Council Milton Keynes › Neighbourhood Bradwell Village › Postcode MK13 0LA What's changing near MK13 0LA Within 2 km, around Bradwell Village in Milton Keynes. Building, planning, schools, transport, prices and crime.
22 new homes completed within 2 km, last 2 years
0 homes given permission on brownfield sites since 2021
+1.2% like-for-like prices in Bradwell Village, 2024 → 2025 (council +1.3%)
+6% recorded crime, last 12 months vs the 12 before
On the map
New homes Extended home Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New-home postcodes with fewer than 5 homes are counted above but not listed. 9 postcodes nearby had new homes completed in the last two years.
6 homes extended 2021–2025, typically adding 27 m²
13 since energy certificates began (2008)
4 in MK13 0LA itself
Extended certificate 2025 Extended certificate 2025 Extended certificate 2020 Extended certificate 2019 Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km 2 storm overflows within 2 km
23 hours of spills in 2025 between them (typical neighbourhood: about 36)
19 spill events counted
Anglian Water Sewers In Bradwell Road into Loughton Brook 10 spills, 19 hours in 2025
800 m away Anglian Water Wolverton Rail Freight Cso into Trib Of River Great Ouse 9 spills, 5 hours in 2025
750 m away Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 66 planned, approved or being built and 15 running (136 MW between them). Those within 5 km are on the map above.
Rooftop solar Vodafone, Fingle Drive - Solar PV Panels Approved, not yet built · 340 kW
Mar 2023 300 m away Rooftop solar New Bradwell School, Bounty Street - Solar Panels Approved, not yet built
May 2026 600 m away Battery storage Alston Drive, Bradwell Abbey - Micro Energy Storage Facility Approved, not yet built · 200 kW
Jul 2025 1.4 km away Rooftop solar Brioche Pasquier UK, Garamonde Drive - Solar Canopies Approved, not yet built · 610 kW
Jan 2025 1.6 km away Battery storage Wolverton Swimming & Fitness Centre, Addington Avenue - Battery Storage Approved, not yet built · 200 kW
Mar 2025 1.6 km away Rooftop solar Volkswagen Group UK, Garamonde Drive - Solar Panels Approved, not yet built · 700 kW
Jan 2025 1.8 km away Rooftop solar Wolverton Swimming And Fitness Centre, Addington Avenue - Solar Panels Approved, not yet built · 380 kW
Oct 2025 2.0 km away Rooftop solar Deltic Avenue, Rooksley - Solar Panels Approved, not yet built · 260 kW
May 2024 2.2 km away Battery storage The Church Of The Latterday Saints, The High Street - Battery Storage Approved, not yet built · 200 kW
Jan 2025 2.3 km away Rooftop solar Ingram Content Group UK, Chapter House - Solar Panels Approved, not yet built · 980 kW
Road and street works within 1 km 3 permitted works running now or planned, 1 of them major.
Major, planned Wallace Street, Milton Keynes Utility repair and maintenance works · ANGLIAN WATER · Road closure
Jan 2027 to Jan 2027 600 m away Minor Bancroft Roundabout, Milton Keynes Highway repair and maintenance works · MILTON KEYNES COUNCIL · Lane closure
Oct 2026 to Oct 2026 850 m away Minor Stratford Road, Wolverton Optional permit (no fee) e.g. for traffic management etc · NETWORK RAIL · Two-way signals
Nov 2026 to Nov 2026 900 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided decided Oct 2019 15.9 km away Decided Millbrook Power Generating Stations · The Rookery Pit Near Stewartby, Bedfordshire decided Mar 2019 18.6 km away Decided decided Oct 2011 19.1 km away Recommendation Rosefield Solar Farm Generating Stations · Four land parcels to the south and west of the East Claydon substation, Bucks. application due September 2025 19.6 km away Decided Green Hill Solar Farm Generating Stations · Land to the south and west of Wellingborough and north of Northampton. decided Oct 2026 21.0 km away Decided decided Sept 2014 26.2 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Milton Keynes Waste Recovery Park (energy from waste, 1.6 km); Falcon Project (battery storage, 3.2 km); The Hazeley Academy (rooftop solar, 4.5 km); The Kickles (solar farm, 5.5 km); Land At Potash Farm (solar farm, 6.6 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.