Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
1storm overflows within 2 km
31hours of spills in 2025 between them (typical neighbourhood: about 36)
6spill events counted
Anglian Water
Stony Stratfordinto River Ouse6 spills, 31 hours in 2025
New-home postcodes with fewer than 5 homes are counted above but not listed. 34 postcodes nearby had new homes completed in the last two years.
Jan 2025 3.1 km away
Battery storage
Bradwell Road - Micro Storage FacilityApproved, not yet built · 200 kW
Jan 2026 3.7 km away
Solar farm
Oaks Farm - Solar FarmApproved, not yet built · 37 MW
May 2026 3.8 km away
Running nearest: Milton Keynes Waste Recovery Park (energy from waste, 2.1 km); The Hazeley Academy (rooftop solar, 4.0 km); Mount Mill Farm (solar farm, 4.3 km); Stony Energy Storage Facility (battery storage, 4.5 km); Land At Potash Farm (solar farm, 4.5 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Rail Freight Interchanges · Land west of the B430, east of Upper Heyford Former Airfield, and south of the village of Ardley
application due March 2026 29.8 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.