Country England and Wales › Region South East › Council Milton Keynes › Neighbourhood Woughton & Woolstone › Postcode MK10 9PE What's changing near MK10 9PE Within 2 km, around Woughton & Woolstone in Milton Keynes. Building, planning, schools, transport, prices and crime.
130 new homes completed within 2 km, last 2 years
0 homes given permission on brownfield sites since 2021
+2.1% like-for-like prices in Woughton & Woolstone, 2024 → 2025 (council +1.3%)
+14% recorded crime, last 12 months vs the 12 before
On the map
New homes Extended home Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 6 new homes completed houses · Jun 2026 – Oct 2026
planned Oct 2026 1.2 km away New homes 22 new homes completed houses · May 2026 – Aug 2026
Aug 2026 1.2 km away New homes 16 new homes completed houses · Jan 2025 – May 2026
May 2026 1.3 km away New homes 9 new homes completed flats · Apr 2026
Apr 2026 1.7 km away New homes 7 new homes completed houses · Nov 2025 – Mar 2026
Mar 2026 1.2 km away New homes 11 new homes completed houses · Jan 2026 – Mar 2026
Mar 2026 1.6 km away New homes 12 new homes completed flats · Dec 2025 – Feb 2026
Feb 2026 1.5 km away New homes 9 new homes completed houses · Nov 2024 – Dec 2025
Dec 2025 1.3 km away New homes 9 new homes completed flats · Dec 2025
Dec 2025 1.5 km away New homes 12 new homes completed flats · Aug 2025
Aug 2025 1.5 km away New homes 12 new homes completed flats · Jun 2025
Jun 2025 1.5 km away New-home postcodes with fewer than 5 homes are counted above but not listed. 13 postcodes nearby had new homes completed in the last two years.
12 homes extended 2021–2025, typically adding 23 m²
21 since energy certificates began (2008)
2 in MK10 9PE itself
Extended certificate 2023 Extended certificate 2020 Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 63 planned, approved or being built and 15 running (58 MW between them). Those within 5 km are on the map above.
Battery storage Hammerwood Gate, By University Roundabout - Micro Energy Storage Approved, not yet built · 200 kW
Jan 2026 950 m away Battery storage Standing Way -Micro Energy Storage Approved, not yet built · 200 kW
Jul 2025 1.5 km away Rooftop solar Northfield Drive, Northfield Drive - Solar Panels Approved, not yet built · 310 kW
Mar 2024 1.6 km away Battery storage Northfield Drive, Tongwell Street - Micro Energy Storage System Approved, not yet built · 200 kW
Feb 2025 1.7 km away Rooftop solar Northfield Drive, Northfield - Solar Panles Approved, not yet built · 750 kW
Mar 2022 1.8 km away Rooftop solar Gosh Foods, Maidstone Road - Solar Panels Approved, not yet built · 450 kW
Feb 2023 2.0 km away Battery storage Brickhill Street, Lakeside Roundabout - Micro Energy Storage Facility Approved, not yet built · 200 kW
Jul 2025 2.1 km away Rooftop solar Chippenham Drive, Kingston - Solar Panels Approved, not yet built · 2 MW
Jul 2024 2.1 km away Rooftop solar Midway Centre, Harding Road - Solar Panels Approved, not yet built · 530 kW
Jul 2023 2.1 km away Battery storage The Venue MK, Hindhead Knoll - Micro Energy Storage Facility Approved, not yet built · 200 kW
Dec 2025 2.2 km away Road and street works within 1 km 1 permitted works running now or planned.
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided Millbrook Power Generating Stations · The Rookery Pit Near Stewartby, Bedfordshire decided Mar 2019 13.1 km away Decided decided Oct 2011 13.6 km away Decided decided Sept 2014 20.3 km away Decided decided Oct 2019 21.2 km away Recommendation Rosefield Solar Farm Generating Stations · Four land parcels to the south and west of the East Claydon substation, Bucks. application due September 2025 21.3 km away Decided Green Hill Solar Farm Generating Stations · Land to the south and west of Wellingborough and north of Northampton. decided Oct 2026 22.9 km away Decided Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Blum Uk - Solar Panels (rooftop solar, 1.6 km); Falcon Project (battery storage, 3.3 km); Red Bull Ford Powertrains, Rindt Building, Bradbourne Drive – Solar Panels (rooftop solar, 3.4 km); Red Bull Racing, Bradbourne Drive - Solar Panels (rooftop solar, 3.4 km); Harvie Card Way - Solar panels (rooftop solar, 3.8 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.