Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
Hammerwood Gate, By University Roundabout - Micro Energy StorageApproved, not yet built · 200 kW
Jan 2026 2.4 km away
Battery storage
Brickhill Street, Lakeside Roundabout - Micro Energy Storage FacilityApproved, not yet built · 200 kW
Jul 2025 3.0 km away
Running nearest: Blum Uk - Solar Panels (rooftop solar, 1000 m); Harvie Card Way - Solar panels (rooftop solar, 2.3 km); University Way, Cranfield - Solar Array (solar farm, 4.1 km); Cranfield University - Solar Farm (solar farm, 4.4 km); Red Bull Ford Powertrains, Rindt Building, Bradbourne Drive – Solar Panels (rooftop solar, 4.5 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.