Country England and Wales › Region South East › Council Swale › Neighbourhood Sittingbourne South, Bapchild & Bredgar › Postcode ME9 9AH What's changing near ME9 9AH Within 2 km, around Sittingbourne South, Bapchild & Bredgar in Swale. Building, planning, schools, transport, prices and crime.
219 new homes completed within 2 km, last 2 years
184 homes given permission on brownfield sites since 2021
+0.2% like-for-like prices in Sittingbourne South, Bapchild & Bredgar, 2024 → 2025 (council +2.5%)
+13% recorded crime, last 12 months vs the 12 before
On the map
New homes Planning granted School opened Extended home Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 25 new homes completed houses · Nov 2025 – Oct 2026
Oct 2026 400 m away New homes 26 new homes completed houses · Aug 2025 – Sep 2026
Sept 2026 400 m away New homes 7 new homes completed flats · Mar 2026 – Apr 2026
Apr 2026 600 m away New homes 8 new homes completed houses · Aug 2025 – Mar 2026
Mar 2026 550 m away New homes 28 new homes completed houses · Jun 2025 – Mar 2026
Mar 2026 650 m away New homes 6 new homes completed houses · May 2025 – Mar 2026
Mar 2026 650 m away New homes 17 new homes completed flats · Mar 2025 – Jan 2026
Jan 2026 650 m away New homes 7 new homes completed houses · Nov 2025 – Jan 2026
Jan 2026 350 m away New homes 20 new homes completed houses · Nov 2024 – Oct 2025
Oct 2025 550 m away New homes 16 new homes completed houses · Nov 2024 – Aug 2025
Aug 2025 550 m away New homes 6 new homes completed flats · May 2025
May 2025 650 m away New homes 13 new homes completed houses · Dec 2024 – Mar 2025
Mar 2025 700 m away 5 homes extended 2021–2025, typically adding 48 m²
9 since energy certificates began (2008)
1 in ME9 9AH itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 24 planned, approved or being built and 13 running (210 MW between them). Those within 5 km are on the map above.
Rooftop solar Hempstead Farm, Hempstead Lane - Solar Panels Approved, not yet built · 680 kW
Oct 2022 400 m away Battery storage Plot 2B EurolinkV Being built · 20 MW
Oct 2021 1.3 km away Rooftop solar Cook Pastry and Pies - Solar Panels Approved, not yet built · 960 kW
Mar 2026 1.8 km away Rooftop solar Floplast, Castle Road - Solar Panels Approved, not yet built · 1 MW
Mar 2024 1.9 km away Battery storage Castle Road, Eurolink - Battery Energy Storage System Approved, not yet built · 200 kW
Dec 2025 2.0 km away Rooftop solar Castle Road, Eurolink - Solar Panels Approved, not yet built · 460 kW
Sept 2023 2.1 km away Rooftop solar Wienerberger, Castle Road - Solar Panels Approved, not yet built · 1 MW
Aug 2024 2.3 km away Solar farm Pitstock Farm - Solar Photovoltaic Panels Approved, not yet built · 41 MW
Oct 2025 3.2 km away Battery storage Ridham Avenue, Swale Way - Kemsley Battery Energy Storage Approved, not yet built · 249 MW
Sept 2024 3.3 km away Rooftop solar Energy Recovery Facility, Barge Way - Solar Panels Planning application in · 270 kW
May 2025 3.6 km away Rooftop solar Road and street works within 1 km 2 permitted works running now or planned, 2 of them major.
Major, planned Church Road, Tonge Utility asset works · BT · Road closure
Nov 2026 to Nov 2026 950 m away Major Church Road, Tonge Utility asset works · BT · Road closure
Nov 2026 to Nov 2026 950 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided decided Jul 2019 3.3 km away Decided decided Feb 2021 3.6 km away Decided Cleve Hill Solar Park Generating Stations · Land approximately 2 km northeast of Faversham and 5 km west of Whitstable on the North Kent Coast. decided May 2020 10.8 km away Decided decided Dec 2017 24.4 km away Decided decided Feb 2013 24.5 km away Decided decided Oct 2025 28.3 km away Decided Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Tonge Corner Farm (solar farm, 2.5 km); K3 CHP Facility (Kemsley EfW) (energy from waste, 3.7 km); Kemsley Substation (battery storage, 4.0 km); Morrisons roof mounted solar (rooftop solar, 4.5 km); Ridham CHP Plant (biomass, 5.4 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.