Country England and Wales › Region South East › Council Maidstone › Neighbourhood Boxley & Detling › Postcode ME5 9NB What's changing near ME5 9NB Within 2 km, around Boxley & Detling in Maidstone. Building, planning, schools, transport, prices and crime.
65 new homes completed within 2 km, last 2 years
9 homes given permission on brownfield sites since 2021
+0.1% like-for-like prices in Boxley & Detling, 2024 → 2025 (council +1.9%)
-11% recorded crime, last 12 months vs the 12 before
On the map
New homes Planning granted Extended home Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 11 new homes completed houses · Nov 2025
Nov 2025 1.6 km away New homes 46 new homes completed flats · Nov 2025
Nov 2025 1.0 km away New homes 5 new homes completed houses · May 2025
May 2025 800 m away Planning permission Apr 2023 1.2 km away New-home postcodes with fewer than 5 homes are counted above but not listed. 5 postcodes nearby had new homes completed in the last two years.
11 homes extended 2021–2025, typically adding 33 m²
20 since energy certificates began (2008)
2 in ME5 9NB itself
Extended certificate 2013 Extended certificate 2012 Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 23 planned, approved or being built and 4 running (86 MW between them). Those within 5 km are on the map above.
Battery storage Mackenders Close - Micro Energy Storage Facility Approved, not yet built · 200 kW
Jan 2025 3.8 km away Rooftop solar St Leonards Road - Solar Panels Approved, not yet built · 150 kW
Jun 2022 4.8 km away Rooftop solar Phinia, Courteney Road - Solar Panels Approved, not yet built · 2 MW
Mar 2024 4.9 km away Rooftop solar Gillingham Technical Centre, Courteney Road - Solar Panels Approved, not yet built · 320 kW
Apr 2024 4.9 km away Rooftop solar Event Centre, Detling Hill - Solar Panels Approved, not yet built · 180 kW
May 2026 4.9 km away Rooftop solar Gillingham Technical Centre, Phinia Courteney Road - Solar PV Systems Approved, not yet built · 320 kW
Apr 2024 5.0 km away Battery storage Wouldham Road, Wouldham - Battery Storage Facility Approved, not yet built · 8 MW
Jan 2022 5.4 km away Rooftop solar Unit A Riverside Business Park - Roof mounted solar panels Approved, not yet built · 990 kW
Jul 2022 5.5 km away Battery storage Beechings Way, Eastcourt Lane - Battery Energy Storage System Approved, not yet built
Sept 2025 6.4 km away Rooftop solar Nutriblend House, Mills Road - Solar Panels Planning application in · 340 kW
May 2026 6.4 km away Road and street works within 1 km No road or street works with a permit running now or planned within 1 km (England; permits granted up to the end of September 2026).
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided decided Jul 2019 16.1 km away Decided decided Feb 2021 16.3 km away Decided Tilbury2 Harbour Facilities · Site of the former Tilbury Power Station, approximately 1 km east of the existing Port of Tilbury decided Feb 2019 17.6 km away Decided decided Feb 2022 17.7 km away Decided decided Mar 2025 22.9 km away Decided Cleve Hill Solar Park Generating Stations · Land approximately 2 km northeast of Faversham and 5 km west of Whitstable on the North Kent Coast. decided May 2020 27.3 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: BIOSSENCE SOLAR PARK (solar farm, 3.6 km); Aylesford BESS (battery storage, 5.4 km); Allington EFW (energy from waste, 5.6 km); Iwade Solar Farm (solar farm, 9.5 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.