Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
7storm overflows within 2 km
24hours of spills in 2025 between them (typical neighbourhood: about 36)
30spill events counted
Southern Water
Bryant Road Stroodinto Tidal River Medway6 spills, 11 hours in 2025
1.5 km away
Southern Water
Cso At Goddington Road Stroodinto The River Medway13 spills, 6 hours in 2025
1.5 km away
Southern Water
Charles Street Strood Csointo Medway Estuary6 spills, 5 hours in 2025
1.5 km away
Southern Water
Vicarage Road Strood Wpsinto River Medway Estuary1 spills, 2 hours in 2025
Medway One - Energy HubApproved, not yet built · 50 MW
Jul 2024 7.8 km away
Battery storage
Medway One - Energy HubApproved, not yet built
Jul 2024 7.8 km away
Running nearest: Barvills Solar Farm (solar farm, 8.5 km); Thurrock Flexible Generation Plant (battery storage, 9.2 km); BIOSSENCE SOLAR PARK (solar farm, 9.6 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Generating Stations · Immediately to the west of the existing Riverside Resource Recovery Facility,Bexley, London
decided Apr 2020 25.6 km away
Decided
M25 junction 28 improvementsHighways · To the west of Brentwood in Essex, at the intersection of the M25, the A12 and the A1023
decided May 2022 27.8 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.