Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
4storm overflows within 2 km
3hours of spills in 2025 between them (typical neighbourhood: about 36)
3spill events counted
Southern Water
Rectory Close Wouldham Wwpsinto The River Medway Estuary2 spills, 3 hours in 2025
1.7 km away
Southern Water
Marsh Road, Halling Combined Eointo The Tidal River Medway1 spills, 1 hours in 2025
1.5 km away
Southern Water
North Halling Wwpsinto River Medway0 spills, 0 hours in 2025
300 m away
Southern Water
Cuxton Combined Emergency Overflowinto The Tidal River Medway0 spills, 0 hours in 2025
Mid Kent College Medway Campus, Medway Road - Battery Storage, ASHPApproved, not yet built · 1 MW
Nov 2023 7.1 km away
Rooftop solar
Mid Kent College, Medway Road - Solar PV ArrayApproved, not yet built · 400 kW
Sept 2023 7.1 km away
Running nearest: BIOSSENCE SOLAR PARK (solar farm, 5.6 km); Aylesford BESS (battery storage, 5.7 km); Allington EFW (energy from waste, 9.3 km); Broadditch Battery Energy (battery storage, 9.8 km); Land off Ford Lane (solar farm, 9.9 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Generating Stations · Immediately to the west of the existing Riverside Resource Recovery Facility,Bexley, London
decided Apr 2020 25.7 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.