Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
1storm overflows within 2 km
0hours of spills in 2025 between them (typical neighbourhood: about 36)
0spill events counted
Southern Water
Ditton Wwtwinto The River Medway0 spills, 0 hours in 2025
New-home postcodes with fewer than 5 homes are counted above but not listed. 28 postcodes nearby had new homes completed in the last two years.
Battery storage
Wouldham Road, Wouldham - Battery Storage FacilityApproved, not yet built · 8 MW
Jan 2022 5.6 km away
Battery storage
Sundridge HillBeing built · 50 MW
Feb 2022 8.2 km away
Running nearest: Aylesford BESS (battery storage, 1.8 km); BIOSSENCE SOLAR PARK (solar farm, 3.4 km); Allington EFW (energy from waste, 4.0 km); Kingshill Solar Farm (solar farm, 4.6 km); Offham Landfill Site Phase II (landfill gas, 5.8 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Generating Stations · Immediately to the west of the existing Riverside Resource Recovery Facility,Bexley, London
decided Apr 2020 30.0 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.