Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
17 new homes completedhouses · Dec 2024 – Nov 2025
Nov 2025 400 m away
New homes
10 new homes completedhouses · Jul 2025
Jul 2025 450 m away
New homes
6 new homes completed1 flats, 5 houses · Jun 2025
Jul 2025 1.6 km away
New homes
5 new homes completedhouses · Feb 2025 – Jun 2025
Jun 2025 450 m away
New homes
10 new homes completedflats · Apr 2025
Apr 2025 400 m away
New homes
10 new homes completedhouses · Feb 2025 – Mar 2025
Mar 2025 350 m away
New homes
10 new homes completedflats · Feb 2025
Feb 2025 450 m away
New homes
10 new homes completedflats · Dec 2024
Dec 2024 450 m away
New-home postcodes with fewer than 5 homes are counted above but not listed. 30 postcodes nearby had new homes completed in the last two years.
Battery storage
Wouldham Road, Wouldham - Battery Storage FacilityApproved, not yet built · 8 MW
Jan 2022 6.2 km away
Battery storage
Platt Industrial Estate,Maidstone Road - Micro Energy Storage FacilityPlanning application in · 200 kW
Oct 2024 8.6 km away
Running nearest: Aylesford BESS (battery storage, 2.5 km); Kingshill Solar Farm (solar farm, 3.8 km); BIOSSENCE SOLAR PARK (solar farm, 4.2 km); Allington EFW (energy from waste, 4.4 km); Offham Landfill Site Phase II (landfill gas, 5.1 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Generating Stations · Immediately to the west of the existing Riverside Resource Recovery Facility,Bexley, London
decided Apr 2020 29.9 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.