Country England and Wales › Region South East › Council Tonbridge and Malling › Neighbourhood Larkfield & New Hythe › Postcode ME19 6SH What's changing near ME19 6SH Within 2 km, around Larkfield & New Hythe in Tonbridge and Malling. Building, planning, schools, transport, prices and crime.
294 new homes completed within 2 km, last 2 years
0 homes given permission on brownfield sites since 2021
+3.0% like-for-like prices in Larkfield & New Hythe, 2024 → 2025 (council +1.4%)
+12% recorded crime, last 12 months vs the 12 before
On the map
New homes Extended home Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 7 new homes completed houses · May 2025 – Oct 2026
Oct 2026 200 m away New homes 19 new homes completed houses · Oct 2024 – Sep 2026
Sept 2026 400 m away New homes 31 new homes completed houses · Dec 2025 – Sep 2026
Sept 2026 1.3 km away New homes 7 new homes completed houses · Jan 2025 – Sep 2026
Sept 2026 1.4 km away New homes 26 new homes completed houses · Feb 2025 – Jun 2026
Jun 2026 250 m away New homes 6 new homes completed houses · Jul 2025 – May 2026
May 2026 450 m away New homes 13 new homes completed houses · Jun 2025 – Apr 2026
Apr 2026 500 m away New homes 6 new homes completed 1 flats, 5 houses · Dec 2025 – Mar 2026
Mar 2026 1.4 km away New homes 5 new homes completed houses · Aug 2025 – Mar 2026
Mar 2026 1.3 km away New homes 24 new homes completed 1 flats, 23 houses · Oct 2024 – Feb 2026
Feb 2026 1.3 km away New homes 21 new homes completed 8 flats, 13 houses · Jun 2025 – Feb 2026
Feb 2026 1.3 km away New homes 7 new homes completed houses · Nov 2025 – Jan 2026
Jan 2026 550 m away 4 homes extended 2021–2025, typically adding 45 m²
13 since energy certificates began (2008)
2 in ME19 6SH itself
Extended certificate 2026 Extended certificate 2014 Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 19 planned, approved or being built and 7 running (98 MW between them). Those within 5 km are on the map above.
Rooftop solar Larkfield Leisure Centre, New Hythe Lane - Solar Panels Approved, not yet built · 160 kW
Dec 2024 1.5 km away Rooftop solar Nutriblend House, Mills Road - Solar Panels Planning application in · 340 kW
May 2026 2.3 km away Battery storage Corona Terrace & Hollow Lane - Micro Energy Storage Approved, not yet built · 200 kW
May 2026 2.6 km away Battery storage Corona Terrace And Hollow Lane - Micro Energy Storage System Planning application in · 200 kW
Nov 2025 2.7 km away Rooftop solar Unit A Riverside Business Park - Roof mounted solar panels Approved, not yet built · 990 kW
Jul 2022 2.7 km away Battery storage Mackenders Close - Micro Energy Storage Facility Approved, not yet built · 200 kW
Jan 2025 4.0 km away Rooftop solar St Leonards Road - Solar Panels Approved, not yet built · 150 kW
Jun 2022 4.4 km away Solar farm Offham Landfill Site - Solar PV Array Being built · 10 MW
Mar 2024 4.7 km away Rooftop solar Mid Kent College, Tonbridge Road - Solar Panels Planning application in · 350 kW
Jul 2023 5.2 km away Solar farm Mid Kent College, Tonbridge Road - Air Source Heat Pumps & Solar Panels Approved, not yet built · 300 kW
Apr 2024 5.2 km away Road and street works within 1 km 2 permitted works running now or planned.
Standard Ashton Way, West Malling Works for road purposes · NATIONAL HIGHWAYS · No carriageway incursion
Mar 2027 to Mar 2027 950 m away Standard Ashton Way, West Malling Works for road purposes · NATIONAL HIGHWAYS · No carriageway incursion
Nov 2026 to Nov 2026 950 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided Tilbury2 Harbour Facilities · Site of the former Tilbury Power Station, approximately 1 km east of the existing Port of Tilbury decided Feb 2019 18.4 km away Decided decided Feb 2022 18.7 km away Decided decided Mar 2025 23.7 km away Decided decided Jul 2019 23.7 km away Decided decided Feb 2021 24.0 km away Decided decided Nov 2025 30.0 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Aylesford BESS (battery storage, 2.7 km); Kingshill Solar Farm (solar farm, 3.7 km); Allington EFW (energy from waste, 4.1 km); BIOSSENCE SOLAR PARK (solar farm, 4.3 km); Offham Landfill Site Phase II (landfill gas, 5.2 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.