Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
12 new homes completedhouses · Nov 2024 – Feb 2025
Feb 2025 1000 m away
New homes
12 new homes completedflats · Feb 2025
Feb 2025 1.5 km away
New homes
10 new homes completedflats · Dec 2024
Dec 2024 1.9 km away
New homes
14 new homes completedflats · Nov 2024
Nov 2024 1.0 km away
New homes
8 new homes completedflats · Nov 2024
Nov 2024 1.0 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 36 postcodes nearby had new homes completed in the last two years.
Solar farm
Mid Kent College, Tonbridge Road - Air Source Heat Pumps & Solar PanelsApproved, not yet built · 300 kW
Apr 2024 6.9 km away
Solar farm
Stangate West Landfill Site, Quarry Hill Road - Solar Park & BatteryPlanning application in · 6 MW
May 2026 6.9 km away
Running nearest: Kingshill Solar Farm (solar farm, 1.6 km); Offham Landfill Site Phase II (landfill gas, 3.0 km); Land off Ford Lane (solar farm, 4.4 km); Aylesford BESS (battery storage, 4.7 km); Allington EFW (energy from waste, 6.2 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Generating Stations · Immediately to the west of the existing Riverside Resource Recovery Facility,Bexley, London
decided Apr 2020 29.5 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.