Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
New-home postcodes with fewer than 5 homes are counted above but not listed. 20 postcodes nearby had new homes completed in the last two years.
Solar farm
Mid Kent College, Tonbridge Road - Air Source Heat Pumps & Solar PanelsApproved, not yet built · 300 kW
Apr 2024 6.1 km away
Battery storage
Platt Industrial Estate,Maidstone Road - Micro Energy Storage FacilityPlanning application in · 200 kW
Oct 2024 8.4 km away
Running nearest: Aylesford BESS (battery storage, 2.5 km); Kingshill Solar Farm (solar farm, 3.8 km); BIOSSENCE SOLAR PARK (solar farm, 4.3 km); Allington EFW (energy from waste, 4.8 km); Offham Landfill Site Phase II (landfill gas, 4.8 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Generating Stations · Immediately to the west of the existing Riverside Resource Recovery Facility,Bexley, London
decided Apr 2020 29.4 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.