Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
Idleigh Court Road, New Ash Green - Solar ArrayPlanning application in · 15 MW
Jan 2025 8.0 km away
Battery storage
Mackenders Close - Micro Energy Storage FacilityApproved, not yet built · 200 kW
Jan 2025 9.1 km away
Running nearest: Offham Landfill Site Phase II (landfill gas, 850 m); Land off Ford Lane (solar farm, 1000 m); Kingshill Solar Farm (solar farm, 3.1 km); Stangate Landfill Site (landfill gas, 4.2 km); Aylesford BESS (battery storage, 7.5 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Generating Stations · Adjacent to and immediately NE of the Kemsley Paper Mill, in Kemsley, Sittingbourne, Kent
decided Feb 2021 29.2 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.