Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
St Leonards Road - Solar PanelsApproved, not yet built · 150 kW
Jun 2022 7.3 km away
Battery storage
Wouldham Road, Wouldham - Battery Storage FacilityApproved, not yet built · 8 MW
Jan 2022 7.4 km away
Running nearest: Kingshill Solar Farm (solar farm, 2.5 km); Offham Landfill Site Phase II (landfill gas, 2.6 km); Land off Ford Lane (solar farm, 3.4 km); Aylesford BESS (battery storage, 4.7 km); BIOSSENCE SOLAR PARK (solar farm, 6.5 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Generating Stations · Immediately to the west of the existing Riverside Resource Recovery Facility,Bexley, London
decided Apr 2020 28.1 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.