Country England and Wales › Region South East › Council Maidstone › Neighbourhood Loose Valley & Boughton Monchelsea › Postcode ME15 9UH What's changing near ME15 9UH Within 2 km, around Loose Valley & Boughton Monchelsea in Maidstone. Building, planning, schools, transport, prices and crime.
103 new homes completed within 2 km, last 2 years
0 homes given permission on brownfield sites since 2021
+6.0% like-for-like prices in Loose Valley & Boughton Monchelsea, 2024 → 2025 (council +1.9%)
+40% recorded crime, last 12 months vs the 12 before
On the map
New homes Extended home Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 5 new homes completed houses · Jul 2026 – Oct 2026
planned Oct 2026 1.6 km away New homes 15 new homes completed 1 flats, 14 houses · Aug 2026
Sept 2026 1.5 km away New homes 33 new homes completed houses · Dec 2025 – Sep 2026
Sept 2026 1.7 km away New homes 10 new homes completed houses · Apr 2026 – Jun 2026
Jun 2026 1.8 km away New homes 5 new homes completed houses · Feb 2026 – Apr 2026
Apr 2026 1.6 km away New homes 18 new homes completed flats · Jul 2025
Jul 2025 1.7 km away New-home postcodes with fewer than 5 homes are counted above but not listed. 16 postcodes nearby had new homes completed in the last two years.
16 homes extended 2021–2025, typically adding 36 m²
29 since energy certificates began (2008)
0 in ME15 9UH itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km 1 storm overflows within 2 km
1 hours of spills in 2025 between them (typical neighbourhood: about 36)
1 spill events counted
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 20 planned, approved or being built and 4 running (90 MW between them). Those within 5 km are on the map above.
Rooftop solar W M Morrisons Supermarkets - Solar panels Approved, not yet built · 360 kW
Apr 2022 1.5 km away Rooftop solar Coxheath County Primary School, Stockett Lane - Solar Panels Approved, not yet built · 170 kW
Dec 2025 2.7 km away Rooftop solar Maidstone Borough Council Depot, Bircholt Road - Solar Panels Approved, not yet built · 180 kW
May 2025 2.9 km away Solar farm Mid Kent College, Tonbridge Road - Air Source Heat Pumps & Solar Panels Approved, not yet built · 300 kW
Apr 2024 3.2 km away Rooftop solar Mid Kent College, Tonbridge Road - Solar Panels Planning application in · 350 kW
Jul 2023 3.3 km away Solar farm East Hill Farm - Solar Panels Approved, not yet built
Sept 2023 3.7 km away Rooftop solar Sutton Road, Langley - Solar Panels Approved, not yet built · 830 kW
Apr 2025 4.0 km away Rooftop solar Berry Gardens, Redwall Lane - Solar Panels Approved, not yet built · 580 kW
Aug 2023 4.4 km away Rooftop solar St Leonards Road - Solar Panels Approved, not yet built · 150 kW
Jun 2022 5.4 km away Rooftop solar Ledian Farm, Upper Street - Solar Photovoltaic Panels Approved, not yet built · 190 kW
Feb 2024 5.6 km away Road and street works within 1 km 11 permitted works running now or planned, 5 of them major.
Major Lancet Lane, Maidstone Utility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Road closure
Nov 2026 to Nov 2026 300 m away Major Halstow Close, Maidstone Utility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Give and take
Aug 2026 to Oct 2026 300 m away Major Halstow Close, Maidstone Utility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · No carriageway incursion
Oct 2026 to Oct 2026 450 m away Major Pickering Street, Loose Utility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Road closure
Oct 2026 to Oct 2026 450 m away Major Lancet Lane, Maidstone Utility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Some carriageway incursion
Nov 2026 to Nov 2026 500 m away Standard Sevington Park, Maidstone Utility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Some carriageway incursion
Nov 2026 to Nov 2026 450 m away Standard Westwood Road, Maidstone New service connection · SOUTHERN GAS NETWORKS PLC · Give and take
Nov 2026 to Nov 2026 500 m away Standard Old Drive, Maidstone Utility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Some carriageway incursion
Nov 2026 to Nov 2026 500 m away Minor Porchester Close, Maidstone Remedial works · BT · Some carriageway incursion
Oct 2026 to Oct 2026 100 m away Major infrastructure projects within 30 km Decided decided Jul 2019 20.6 km away Decided decided Feb 2021 20.9 km away Decided Tilbury2 Harbour Facilities · Site of the former Tilbury Power Station, approximately 1 km east of the existing Port of Tilbury decided Feb 2019 25.4 km away Decided decided Feb 2022 25.6 km away Decided Cleve Hill Solar Park Generating Stations · Land approximately 2 km northeast of Faversham and 5 km west of Whitstable on the North Kent Coast. decided May 2020 29.5 km away Decided decided Dec 2017 29.9 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Allington EFW (energy from waste, 4.9 km); BIOSSENCE SOLAR PARK (solar farm, 8.6 km); Aylesford BESS (battery storage, 8.9 km); Widehurst Farm (solar farm, 9.9 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.