Country England and Wales › Region South East › Council Swale › Neighbourhood Boughton & Selling › Postcode ME13 9BH What's changing near ME13 9BH Within 2 km, around Boughton & Selling in Swale. Building, planning, schools, transport, prices and crime.
0 new homes completed within 2 km, last 2 years
0 homes given permission on brownfield sites since 2021
+2.0% like-for-like prices in Boughton & Selling, 2024 → 2025 (council +2.5%)
-16% recorded crime, last 12 months vs the 12 before
On the map
Extended home Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first No new homes (5+ in a postcode), planning permissions or school changes recorded within 2 km.
New-home postcodes with fewer than 5 homes are counted above but not listed. 0 postcodes nearby had new homes completed in the last two years.
4 homes extended 2021–2025, typically adding 72 m²
5 since energy certificates began (2008)
0 in ME13 9BH itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km 1 storm overflows within 2 km
100 hours of spills in 2025 between them (typical neighbourhood: about 36)
31 spill events counted
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 17 planned, approved or being built and 4 running (529 MW between them). Those within 5 km are on the map above.
Rooftop solar Ewell Farm, Graveney Road -Solar Panels Approved, not yet built · 410 kW
Jul 2025 2.7 km away Rooftop solar Norham Farm, Selling Road - Solar Panels Approved, not yet built · 300 kW
Mar 2026 3.2 km away Rooftop solar Shepherd Neame, North Lane - Solar Panels Approved, not yet built · 230 kW
Oct 2022 4.6 km away Rooftop solar Mansfield Farms, Nickle Lane - Solar Array Approved, not yet built · 370 kW
Dec 2022 4.8 km away Rooftop solar Mansfield Farms, Nickle Lane - Solar Array Approved, not yet built · 370 kW
Sept 2022 5.1 km away Rooftop solar Nickle Farm, Nickle Lane - Solar Panels Approved, not yet built · 310 kW
Oct 2024 5.1 km away Rooftop solar Nickle Farm, Nickle Lane - Solar Panels Approved, not yet built · 150 kW
Apr 2025 5.1 km away Rooftop solar Nickle Farm, Mansfield Farms - Solar Panels Approved, not yet built · 180 kW
Jul 2025 5.1 km away Rooftop solar Howfield Farm, Howfield Lane - Solar Panels Approved, not yet built · 400 kW
Oct 2025 6.8 km away Battery storage Markerstudy Business Park, Wraik Hill - Micro Energy Storage Approved, not yet built · 200 kW
Nov 2025 6.9 km away Road and street works within 1 km 3 permitted works running now or planned, 1 of them major.
Major, planned The Street, Boughton Under Blean Utility repair and maintenance works · BT · Road closure
Dec 2026 to Dec 2026 300 m away Minor Canterbury Road, Boughton Under Blean Highway repair and maintenance works · NATIONAL HIGHWAYS · No carriageway incursion
Nov 2026 to Nov 2026 650 m away Minor Canterbury Road, Boughton Under Blean Highway repair and maintenance works · NATIONAL HIGHWAYS · No carriageway incursion
Dec 2026 to Dec 2026 1000 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided Cleve Hill Solar Park Generating Stations · Land approximately 2 km northeast of Faversham and 5 km west of Whitstable on the North Kent Coast. decided May 2020 5.0 km away Decided decided Jul 2019 15.3 km away Decided decided Feb 2021 15.3 km away Decided decided Feb 2013 16.8 km away Decided decided Dec 2017 18.1 km away Decided decided Aug 2017 20.4 km away Decided Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Abbey Fields Farm (solar farm, 4.1 km); Nickle Farm (rooftop solar, 5.1 km); Cleve Hill Solar Project (solar farm, 5.3 km); Cleve Hill Solar Project (battery storage, 5.3 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.