Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
3storm overflows within 2 km
20hours of spills in 2025 between them (typical neighbourhood: about 36)
26spill events counted
Southern Water
Court Street Faversham Csointo Faversham Creek25 spills, 19 hours in 2025
1.4 km away
Southern Water
North Lane Faversham Csointo The Faversham Creek1 spills, 0 hours in 2025
1.3 km away
Southern Water
Hazebrouck Road Faversham Wwpsinto Faversham Creek (Via Drain)0 spills, 0 hours in 2025
Castle Road, Eurolink - Battery Energy Storage SystemApproved, not yet built · 200 kW
Dec 2025 8.9 km away
Running nearest: Abbey Fields Farm (solar farm, 2.3 km); Cleve Hill Solar Project (solar farm, 4.0 km); Cleve Hill Solar Project (battery storage, 4.0 km); Tonge Corner Farm (solar farm, 7.6 km); Old Rides solar Farm (solar farm, 8.6 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Electric Lines · Richborough to Canterbury
decided Aug 2017 25.9 km away
Pre-application
Shepway Energy ParkGenerating Stations · Located on land north of Newchurch and 6km south of Ashford in Kent.
application due November 2027 29.9 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.