Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
8storm overflows within 2 km
68hours of spills in 2025 between them (typical neighbourhood: about 36)
59spill events counted
Southern Water
Faversham Wwtwinto Faversham Creek5 spills, 25 hours in 2025
1.9 km away
Southern Water
Court Street Faversham Csointo Faversham Creek25 spills, 19 hours in 2025
New-home postcodes with fewer than 5 homes are counted above but not listed. 24 postcodes nearby had new homes completed in the last two years.
Pitstock Farm - Solar Photovoltaic PanelsApproved, not yet built · 41 MW
Oct 2025 9.5 km away
Rooftop solar
Mansfield Farms, Nickle Lane - Solar ArrayApproved, not yet built · 370 kW
Dec 2022 9.6 km away
Running nearest: Abbey Fields Farm (solar farm, 1.3 km); Cleve Hill Solar Project (solar farm, 3.3 km); Cleve Hill Solar Project (battery storage, 3.3 km); Tonge Corner Farm (solar farm, 8.5 km); Old Rides solar Farm (solar farm, 8.7 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Electric Lines · Richborough to Canterbury
decided Aug 2017 24.9 km away
Pre-application
Shepway Energy ParkGenerating Stations · Located on land north of Newchurch and 6km south of Ashford in Kent.
application due November 2027 29.8 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.