Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
29storm overflows within 2 km
1,031hours of spills in 2025 between them (typical neighbourhood: about 36)
479spill events counted
United Utilities
Rochdale Rd / Burgin Walk Csointo The River Irk92 spills, 415 hours in 2025
1.9 km away
United Utilities
Moston Lane/Rochdale Road Csointo River Irk59 spills, 209 hours in 2025
1.9 km away
United Utilities
Beaumont Building Cso 28049into River Irwell34 spills, 72 hours in 2025
2.0 km away
United Utilities
Julia Sreett Csointo River Irwell49 spills, 62 hours in 2025
1.8 km away
United Utilities
Waterloo St Crescent Rd Csointo River Irk18 spills, 38 hours in 2025
1.8 km away
United Utilities
Aspin Lane Cso 281cjinto River Irk50 spills, 35 hours in 2025
1.9 km away
United Utilities
Radford Street Csointo River Irwell Via Sws30 spills, 31 hours in 2025
1.6 km away
United Utilities
Sherborne Street Csointo River Irwell18 spills, 31 hours in 2025
Intermodal Logistics Park NorthRail Freight Interchanges · Site known as Intermodal Logistics Park North – land bounded by the M6 motorway (west), Winwick Lane (south and east) and Chat Moss railway line (north).
application due May 2027 23.3 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Broughton East: +5% over five years (2020 → 2025).
Council tax list: 0 homes added in the neighbourhood since April 2024.
Population (GP registrations): -0.9% in two years.