What's changing near M34 7TQ
Within 2 km, around Denton East in Tameside. Building, planning, schools, transport, prices and crime.
32new homes completed within 2 km, last 2 years
45homes given permission on brownfield sites since 2021
+4.3%like-for-like prices in Denton East, 2024 → 2025 (council +4.6%)
–crime data not published here (Greater Manchester)
On the map
New homesPlanning grantedSchool openedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
4homes extended 2021–2025, typically adding 24 m²
8since energy certificates began (2008)
0in M34 7TQ itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
23storm overflows within 2 km
2,525hours of spills in 2025 between them (typical neighbourhood: about 36)
738spill events counted
- United Utilities
Denton Transfer Pumping Stationinto River Tame71 spills, 599 hours in 2025
1.9 km away - United Utilities
Denton Transfer Pumping Stationinto River Tame64 spills, 298 hours in 2025
1.9 km away - United Utilities
Hyde Wastewater Treatment Worksinto River Tame69 spills, 293 hours in 2025
200 m away - United Utilities
Meadow Lane Combined Sewer Overflowinto River Tame67 spills, 257 hours in 2025
1.6 km away - United Utilities
Broomstair Road Csointo River Tame43 spills, 253 hours in 2025
2.0 km away - United Utilities
Sheridan Way Cso 44179into River Tame48 spills, 170 hours in 2025
1.5 km away - United Utilities
Raglan Street Cso 44180into River Tame58 spills, 135 hours in 2025
600 m away - United Utilities
Hyde Wastewater Treatment Worksinto River Tame18 spills, 112 hours in 2025
200 m away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
65 planned, approved or being built and 12 running (67 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Morrisons Superstore, Saxon Street - Solar panelsApproved, not yet built · 460 kW
May 2024
1.3 km away - Rooftop solar
Concordia - Solar PanelsApproved, not yet built · 240 kW
Jan 2024
1.3 km away - Rooftop solar
Morrisons Superstore, Mottram Road - Solar PanelsApproved, not yet built · 480 kW
Nov 2025
1.5 km away - Battery storage
Sheffield Road - Battery Storage SystemApproved, not yet built
Sept 2022
2.3 km away - Battery storage
Tudor Industrial Estate, Ashton Street- Micro Energy StorageApproved, not yet built · 200 kW
Sept 2025
2.4 km away - Battery storage
Ashton Road, Bredbury - Battery Energy StorageApproved, not yet built · 75 MW
Jul 2025
3.0 km away - Battery storage
Tame Box, Tame Street - Battery StorageApproved, not yet built · 200 kW
Oct 2022
3.9 km away - Battery storage
Holden WayApproved, not yet built · 6 MW
Jun 2018
3.9 km away - Landfill gas
Tame Power - Flexible Energy FacilityApproved, not yet built · 5 MW
Dec 2024
4.0 km away - Rooftop solar
Burlington Street - Solar PV PanelsApproved, not yet built · 910 kW
Jan 2024
4.3 km away - Battery storage
Road and street works within 1 km
4 permitted works running now or planned.
- Standard
Pine Grove, DentonNew service connection · SP Electricity North West · Give and take
Jan 2027 to Jan 2027
650 m away - Minor
Manchester Road, HydeOptional permit (no fee) e.g. for traffic management etc · NETWORK RAIL · Two-way signals
Oct 2026 to Oct 2026
850 m away - Minor
M67 From J2 To J3 E, TamesideWorks for Rail Purposes · NETWORK RAIL · Lane closure
Nov 2026 to Nov 2026
950 m away - Minor
M67 From J2 To J3 E, TamesideWorks for Rail Purposes · NETWORK RAIL · Lane closure
Nov 2026 to Nov 2026
950 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decideddecided Nov 2022
6.2 km away - Decideddecided Sept 2025
15.6 km away - Decideddecided Aug 2014
23.5 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Denton Hall Farm Road, Denton - Solar Photovoltaic System (rooftop solar, 2.4 km); Bredbury Park Way - AD Stockport (Waste AD) (anaerobic digestion, 2.6 km); Godley Water Treatment Works (solar farm, 2.6 km); Welkin Road, Bredbury - Battery Storage System (battery storage, 4.5 km); Tesco Super-Store (Garratt Way, Gorton) (rooftop solar, 5.3 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.