What's changing near M34 5BP
Within 2 km, around Guide Bridge in Tameside. Building, planning, schools, transport, prices and crime.
9new homes completed within 2 km, last 2 years
81homes given permission on brownfield sites since 2021
+6.5%like-for-like prices in Guide Bridge, 2024 → 2025 (council +4.6%)
–crime data not published here (Greater Manchester)
On the map
New homesPlanning grantedSchool openedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New schoolJan 2025
1.2 km away - Planning permissionJan 2023
1.6 km away - Planning permissionDec 2022
850 m away - Planning permission
Permission for 32 homesFormer site of North Star Public House, Queen Street, Dukinfield, SK16 4LS (full planning permission) Nov 2021
2.0 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 5 postcodes nearby had new homes completed in the last two years.
10homes extended 2021–2025, typically adding 28 m²
20since energy certificates began (2008)
0in M34 5BP itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
13storm overflows within 2 km
2,308hours of spills in 2025 between them (typical neighbourhood: about 36)
422spill events counted
- United Utilities
Dukinfield Wwtwinto River Tame52 spills, 563 hours in 2025
650 m away - United Utilities
Ashton-Under-Lyne Wwtwinto River Tame39 spills, 467 hours in 2025
500 m away - United Utilities
Ashton-Under-Lyne Wwtwinto River Tame38 spills, 344 hours in 2025
500 m away - United Utilities
Broomstair Road Csointo River Tame43 spills, 253 hours in 2025
550 m away - United Utilities
Wharf Street Cso 44184into River Tame59 spills, 202 hours in 2025
1.6 km away - United Utilities
Dukinfield Wwtwinto River Tame51 spills, 183 hours in 2025
650 m away - United Utilities
Oxford St/Pottinger St Cso (44045)into River Tame55 spills, 121 hours in 2025
1.0 km away - United Utilities
Lumb Lane (Audenshaw) Cso & Det Tnkinto Culverted Section Of Gore Brook9 spills, 73 hours in 2025
1.4 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
80 planned, approved or being built and 12 running (67 MW between them). Those within 5 km are on the map above.
- Battery storage
Tudor Industrial Estate, Ashton Street- Micro Energy StorageApproved, not yet built · 200 kW
Sept 2025
750 m away - Rooftop solar
Morrisons Superstore, Saxon Street - Solar panelsApproved, not yet built · 460 kW
May 2024
1.5 km away - Rooftop solar
Concordia - Solar PanelsApproved, not yet built · 240 kW
Jan 2024
1.7 km away - Rooftop solar
Burlington Street - Solar PV PanelsApproved, not yet built · 910 kW
Jan 2024
2.0 km away - Battery storage
Holden WayApproved, not yet built · 6 MW
Jun 2018
2.8 km away - Landfill gas
Tame Power - Flexible Energy FacilityApproved, not yet built · 5 MW
Dec 2024
3.0 km away - Rooftop solar
Tameside College, Beaufort Road - Solar PanelsApproved, not yet built · 400 kW
Sept 2025
3.1 km away - Rooftop solar
Laurus Ryecroft High School, Lumb Lane - Solar PanelsApproved, not yet built · 270 kW
Sept 2025
3.1 km away - Battery storage
Tame Box, Tame Street - Battery StorageApproved, not yet built · 200 kW
Oct 2022
3.1 km away - Rooftop solar
Morrisons Superstore, Mottram Road - Solar PanelsApproved, not yet built · 480 kW
Nov 2025
3.1 km away - Battery storage
Road and street works within 1 km
No road or street works with a permit running now or planned within 1 km (England; permits granted up to the end of September 2026).
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decideddecided Nov 2022
7.2 km away - Decideddecided Sept 2025
13.3 km away - Decideddecided Aug 2014
23.8 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Denton Hall Farm Road, Denton - Solar Photovoltaic System (rooftop solar, 2.5 km); Godley Water Treatment Works (solar farm, 3.9 km); Tesco Super-Store (Garratt Way, Gorton) (rooftop solar, 4.1 km); Bredbury Park Way - AD Stockport (Waste AD) (anaerobic digestion, 4.5 km); City Football Academy, Ashton New Road - Solar panels (rooftop solar, 5.5 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.