Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
10storm overflows within 2 km
597hours of spills in 2025 between them (typical neighbourhood: about 36)
272spill events counted
United Utilities
Rear Of Kennedy Way Csointo Denton Brook Via Sws83 spills, 231 hours in 2025
1.7 km away
United Utilities
Ross Lave Lane Csointo Unnamed Trib Of Denton Brook65 spills, 178 hours in 2025
1.7 km away
United Utilities
Town Lane Circular Road Cso 44020into Denton Brook Trib River Tame46 spills, 90 hours in 2025
1.7 km away
United Utilities
Victoria St/Acre St Cso (442wa)into Denton Brook Via Sws34 spills, 37 hours in 2025
1.6 km away
United Utilities
Thornley Lane South Cso 44019into Unnamed Trib Denton Brk Sws10 spills, 22 hours in 2025
1.3 km away
United Utilities
Shoecroft Garage Site Csointo Denton Brook Via Sws15 spills, 19 hours in 2025
1.7 km away
United Utilities
Windmill Lane Cso 44012into Denton Brook Via Clvr Wcourse9 spills, 14 hours in 2025
1.1 km away
United Utilities
Manshaw Road Csointo Moss Brook Via Sws4 spills, 3 hours in 2025
Intermodal Logistics Park NorthRail Freight Interchanges · Site known as Intermodal Logistics Park North – land bounded by the M6 motorway (west), Winwick Lane (south and east) and Chat Moss railway line (north).
application due May 2027 29.2 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Dane Bank: +41% over five years (2020 → 2025).
Council tax list: 0 homes added in the neighbourhood since April 2024.
Population (GP registrations): -0.2% in two years.
New-home postcodes with fewer than 5 homes are counted above but not listed. 17 postcodes nearby had new homes completed in the last two years.
Rooftop solar
Concordia - Solar PanelsApproved, not yet built · 240 kW
Jan 2024 3.7 km away
Battery storage
Ashton Road, Bredbury - Battery Energy StorageApproved, not yet built · 75 MW
Jul 2025 3.9 km away
Running nearest: Denton Hall Farm Road, Denton - Solar Photovoltaic System (rooftop solar, 1.2 km); Tesco Super-Store (Garratt Way, Gorton) (rooftop solar, 1.9 km); Outer Space Studios Solar Panels (rooftop solar, 3.8 km); Bredbury Park Way - AD Stockport (Waste AD) (anaerobic digestion, 3.9 km); City Football Academy, Ashton New Road - Solar panels (rooftop solar, 4.1 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Westbourne Range, Manchester
Remedial works · United Utilities Water Ltd · Some carriageway incursion
Oct 2026 to Oct 2026 650 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.