Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
5storm overflows within 2 km
343hours of spills in 2025 between them (typical neighbourhood: about 36)
68spill events counted
United Utilities
Vicars Hall Lane Ps No 2into Ellen Brook15 spills, 154 hours in 2025
400 m away
United Utilities
Booths Bank Farm Cso (379lu)into Shaw Brook17 spills, 122 hours in 2025
1.1 km away
United Utilities
Newearth Road Csointo Tributary Of Ellen Brook26 spills, 51 hours in 2025
1.3 km away
United Utilities
Parr Bridge/Mosley Common Rd Csointo Honksford Brook8 spills, 14 hours in 2025
1.2 km away
United Utilities
Fir Tree Avenue Pumping Stationinto Sniggley Ditch2 spills, 2 hours in 2025
Intermodal Logistics Park NorthRail Freight Interchanges · Site known as Intermodal Logistics Park North – land bounded by the M6 motorway (west), Winwick Lane (south and east) and Chat Moss railway line (north).
Hynet North West Hydrogen PipelineGas Transporter Pipe-lines · An approximate 125km pipeline centred approximately 1km south west of Lower Whitley, Cheshire
Peak Cluster CCS PipelineOther Pipe-lines · A carbon dioxide transport pipeline network connecting carbon capture sites in Derbyshire, Staffordshire and Cheshire to a coastal location on the Wirral peninsula
application due September 2027 26.9 km away
Decided
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Ellenbrook & Boothstown: +30% over five years (2020 → 2025).
Council tax list: 10 homes added in the neighbourhood since April 2024.
Population (GP registrations): +0.3% in two years.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.