Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
16storm overflows within 2 km
407hours of spills in 2025 between them (typical neighbourhood: about 36)
274spill events counted
United Utilities
Cso Adj To Number 214 Rake Laneinto Slack Brook19 spills, 74 hours in 2025
900 m away
United Utilities
City Walk Psinto Trib Slack Brook34 spills, 63 hours in 2025
Intermodal Logistics Park NorthRail Freight Interchanges · Site known as Intermodal Logistics Park North – land bounded by the M6 motorway (west), Winwick Lane (south and east) and Chat Moss railway line (north).
Peak Cluster CCS PipelineOther Pipe-lines · A carbon dioxide transport pipeline network connecting carbon capture sites in Derbyshire, Staffordshire and Cheshire to a coastal location on the Wirral peninsula
application due September 2027 29.4 km away
Pre-application
Hynet North West Hydrogen PipelineGas Transporter Pipe-lines · An approximate 125km pipeline centred approximately 1km south west of Lower Whitley, Cheshire
application due Dec 202729.6 km away
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Swinton Worsley Road: +33% over five years (2020 → 2025).
Council tax list: 20 homes added in the neighbourhood since April 2024.
Population (GP registrations): +0.8% in two years.
Permission for 1 home141-143 Manchester Road Clifton Swinton M27 8PH (full planning permission)
Jan 2021 1.6 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 3 postcodes nearby had new homes completed in the last two years.
Shore Top Farm, Kearsley Road - Battery Energy StorageApproved, not yet built · 11 MW
Nov 2025 4.6 km away
Rooftop solar
Broughton Hub, Rigby Street - Solar PanelsApproved, not yet built · 190 kW
Nov 2024 4.6 km away
Running nearest: Clifton Hall (landfill gas, 1.5 km); Salford Refuse Treatment Plant (AD) (anaerobic digestion, 3.2 km); Bent Spur Solar Farm (solar farm, 4.0 km); Bolton TRF (energy from waste, 8.2 km); Whitehead Landfill (landfill gas, 8.2 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.