Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
10storm overflows within 2 km
1,417hours of spills in 2025 between them (typical neighbourhood: about 36)
365spill events counted
United Utilities
Sion Street Cso 09026into River Irwell61 spills, 496 hours in 2025
1.4 km away
United Utilities
Lomax Street Csointo The River Irwell90 spills, 392 hours in 2025
1.9 km away
United Utilities
Stand Lane Cso 09058into River Irwell69 spills, 201 hours in 2025
1.8 km away
United Utilities
Bolton Rd Canute Street Csointo River Irwell72 spills, 170 hours in 2025
1.4 km away
United Utilities
Radcliffe Central Csointo River Irwell37 spills, 85 hours in 2025
1.8 km away
United Utilities
St Andrews Rd Brooks Av Cso 09001into Black Lane Brook10 spills, 39 hours in 2025
1.1 km away
United Utilities
Radcliffe Central Csointo River Irwell13 spills, 18 hours in 2025
1.8 km away
United Utilities
108-110 Water Street Cso (Bry0139)into Manchester, Bolton & Bury Canal7 spills, 12 hours in 2025
Intermodal Logistics Park NorthRail Freight Interchanges · Site known as Intermodal Logistics Park North – land bounded by the M6 motorway (west), Winwick Lane (south and east) and Chat Moss railway line (north).
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Radcliffe: +37% over five years (2020 → 2025).
Council tax list: 10 homes added in the neighbourhood since April 2024.
Population (GP registrations): -0.5% in two years.