Country England and Wales › Region North West › Council Bury › Neighbourhood Sedgley Park › Postcode M25 0JH What's changing near M25 0JH Within 2 km, around Sedgley Park in Bury. Building, planning, schools, transport, prices and crime.
57 new homes completed within 2 km, last 2 years
100 homes given permission on brownfield sites since 2021
-0.5% like-for-like prices in Sedgley Park, 2024 → 2025 (council +3.7%)
– crime data not published here (Greater Manchester)
On the map
New homes Planning granted School opened School closed Extended home Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first School closed School closed: Prestwich Preparatory School Other independent school, other independent school (closure)
Mar 2026 1.6 km away New homes 24 new homes completed flats · Dec 2025
Dec 2025 900 m away New homes 18 new homes completed flats · May 2025
May 2025 1.8 km away School closed School closed: Toras Moshe Other independent school, other independent school (closure)
Feb 2024 1.7 km away New school Oct 2023 1.5 km away Planning permission Dec 2022 700 m away New school New school: Toras Moshe Other independent school, other independent school
Oct 2022 1.7 km away Planning permission Permission for 4 homes 18 Marston Road Salford M7 4ER (full planning permission)
Sept 2022 1.4 km away Planning permission Permission for 1 home 8 Ralston Close Salford M7 4QQ (full planning permission)
May 2022 1.5 km away Planning permission Permission for 8 homes Park Lea Court Upper Park Road Salford (full planning permission)
Apr 2022 1.0 km away 21 homes extended 2021–2025, typically adding 28 m²
59 since energy certificates began (2008)
1 in M25 0JH itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km 17 storm overflows within 2 km
132 hours of spills in 2025 between them (typical neighbourhood: about 36)
137 spill events counted
United Utilities Radford Street Cso into River Irwell Via Sws 30 spills, 31 hours in 2025
1.4 km away United Utilities Bury New Road Cso into Singleton Brook 27 spills, 24 hours in 2025
700 m away United Utilities Prestwich Golf Course Cso 093ir into Singleton Brook 8 spills, 15 hours in 2025
1.3 km away United Utilities South Of Blackley New Road Cso into River Irk 17 spills, 15 hours in 2025
1.3 km away United Utilities Middleton Road/Victoria Avenue Cso into Tributary Of River Irk 4 spills, 13 hours in 2025
1.8 km away United Utilities Victoria Avenue/River Irk Cso into River Irk 4 spills, 10 hours in 2025
1.9 km away United Utilities Kendall Road Blackley Cso into River Irk Via Birch Brook Clvr 5 spills, 8 hours in 2025
1.3 km away United Utilities Chuddleigh Road Cso into The River Irk Via Sws 13 spills, 7 hours in 2025
1.9 km away Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 81 planned, approved or being built and 13 running (78 MW between them). Those within 5 km are on the map above.
Rooftop solar Broughton Hub, Rigby Street - Solar Panels Approved, not yet built · 190 kW
Nov 2024 1.6 km away Rooftop solar Polyflor Limited, Prestwich Delivery Office - Solar Panels Approved, not yet built
Jul 2025 2.1 km away Rooftop solar Sainsburys Supermarkets, Heaton Park Road - Solar Panels Planning application in · 290 kW
May 2026 2.6 km away Hydro Charlestown Weir Approved, not yet built · 200 kW
Mar 2019 2.6 km away Rooftop solar Jj Food Service, 1A Lamplight Way - Solar panels Approved, not yet built · 400 kW
Nov 2023 2.8 km away Rooftop solar The Albion Academy, London Street - Solar Panels Approved, not yet built · 220 kW
Oct 2025 3.1 km away Rooftop solar Riverside Works, Collyhurst Road - Solar Panels Approved, not yet built · 460 kW
Feb 2026 3.6 km away Rooftop solar Park 17 Industrial Estate - Solar PV Array Approved, not yet built · 170 kW
Jun 2024 3.7 km away Rooftop solar Manchester Communication Academy, Silchester Drive - Solar Panels Approved, not yet built · 260 kW
Sept 2023 3.9 km away Battery storage Moston Vale Being built · 10 MW
Jul 2021 4.1 km away Rooftop solar Road and street works within 1 km 8 permitted works running now or planned, 4 of them major.
Major, planned Singleton Road, Salford Highway improvement works · SALFORD CITY COUNCIL · Two-way signals
Jan 2027 to Apr 2027 600 m away Major, planned Bury Old Road, Salford Highway improvement works · SALFORD CITY COUNCIL · Two-way signals
Jan 2027 to Apr 2027 600 m away Major Chandos Road, Prestwich Utility repair and maintenance works · BT · Road closure
Oct 2026 to Oct 2026 800 m away Major Whittaker Lane, Prestwich New service connection · SP Electricity North West · Lane closure
Oct 2026 to Oct 2026 950 m away Standard Cavendish Road, Salford Disconnection or alteration of supply · United Utilities Water Ltd · Give and take
Oct 2026 to Oct 2026 500 m away Standard Upper Park Road, Salford Utility repair and maintenance works · United Utilities Water Ltd · Two-way signals
Oct 2026 to Oct 2026 800 m away Minor Bland Road, Prestwich Utility repair and maintenance works · BT · Multi-way signals
Oct 2026 to Oct 2026 850 m away Minor Park Street, Prestwich Utility repair and maintenance works · United Utilities Water Ltd · Some carriageway incursion
Oct 2026 to Oct 2026 850 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided decided Sept 2025 3.1 km away Decided decided Nov 2022 18.5 km away Decided decided Aug 2014 22.0 km away Pre-application Intermodal Logistics Park North Rail Freight Interchanges · Site known as Intermodal Logistics Park North – land bounded by the M6 motorway (west), Winwick Lane (south and east) and Chat Moss railway line (north). application due May 2027 22.8 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Salford Refuse Treatment Plant (AD) (anaerobic digestion, 3.3 km); Clifton Hall (landfill gas, 3.4 km); Central Park - Solar photovaltics (rooftop solar, 4.6 km); Reliance Street Mechanical Biological Treatment Facility (MBT) (anaerobic digestion, 5.8 km); Pilsworth Landfill Site (other, 6.2 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.