Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
8storm overflows within 2 km
212hours of spills in 2025 between them (typical neighbourhood: about 36)
92spill events counted
United Utilities
Chester Road/Great Jackson Road Csointo River Medlock13 spills, 66 hours in 2025
2.0 km away
United Utilities
Rolls Crescent/Yew Street Csointo Manchester Ship Canal Via Sws14 spills, 50 hours in 2025
1.7 km away
United Utilities
Egerton St Worsley St Csointo The River Medlock45 spills, 35 hours in 2025
1.9 km away
United Utilities
City Rd Cso 288ovinto Via Sws Manchester Ship Canal9 spills, 31 hours in 2025
1.7 km away
United Utilities
Stretford Rd/Upper Moss Ln Junc Csointo Manchester Ship Canal Via Sws7 spills, 22 hours in 2025
1.7 km away
United Utilities
Northumberland Rd/Stretford Rd Csointo Manchester Ship Canal4 spills, 7 hours in 2025
Intermodal Logistics Park NorthRail Freight Interchanges · Site known as Intermodal Logistics Park North – land bounded by the M6 motorway (west), Winwick Lane (south and east) and Chat Moss railway line (north).
application due May 2027 21.4 km away
Pre-application
Peak Cluster CCS PipelineOther Pipe-lines · A carbon dioxide transport pipeline network connecting carbon capture sites in Derbyshire, Staffordshire and Cheshire to a coastal location on the Wirral peninsula
application due September 2027 26.0 km away
Pre-application
Keuper Underground Gas Storage Facility Material Change 1Underground Gas Storage Facilities · Holford Brinefield, Cheshire, approximately 3km due West of the M6 and 3km North of Junction 18. This area is bounded to the west by the A530 (King Street) and to the east by the B5081.The Gas Processing Plant (GPP) will be located approximately 369886 East, 370226 North.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Old Trafford: +16% over five years (2020 → 2025).
Council tax list: 150 homes added in the neighbourhood since April 2024.
Population (GP registrations): -0.8% in two years.
17 new homes completed6 flats, 11 houses · Dec 2025 – Jun 2026
Jun 2026 1.3 km away
New homes
70 new homes completedflats · Jun 2026
Jun 2026 1.3 km away
New homes
19 new homes completedflats · Dec 2025 – Apr 2026
Apr 2026 550 m away
New homes
46 new homes completedflats · Mar 2026
Mar 2026 1.3 km away
New homes
48 new homes completedflats · Mar 2026
Mar 2026 1.3 km away
New homes
41 new homes completedflats · Mar 2026
Mar 2026 1.3 km away
New homes
15 new homes completedflats · Nov 2025 – Mar 2026
Mar 2026 1.3 km away
New homes
70 new homes completedflats · Mar 2026
Mar 2026 1.3 km away
New homes
65 new homes completedflats · Mar 2026
Mar 2026 1.3 km away
New homes
46 new homes completedflats · Mar 2026
Mar 2026 1.3 km away
New homes
48 new homes completedflats · Feb 2026
Mar 2026 1.3 km away
New homes
73 new homes completedflats · Aug 2025 – Mar 2026
Mar 2026 1.6 km away
New homes
61 new homes completedflats · Nov 2025 – Feb 2026
Feb 2026 1.3 km away
New homes
89 new homes completedflats · Dec 2025 – Feb 2026
Feb 2026 1.3 km away
New homes
27 new homes completedflats · Dec 2025
Dec 2025 1.3 km away
New homes
34 new homes completedflats · Oct 2025
Oct 2025 1.3 km away
New homes
33 new homes completedflats · Sep 2025
Sept 2025 1.5 km away
New homes
70 new homes completedflats · Sep 2025
Sept 2025 1.5 km away
New homes
23 new homes completedflats · Sep 2025
Sept 2025 1.3 km away
New homes
23 new homes completedflats · Jul 2025
Aug 2025 1.3 km away
New homes
59 new homes completedflats · Aug 2025
Aug 2025 1.5 km away
New homes
65 new homes completedflats · Aug 2025
Aug 2025 1.5 km away
New homes
72 new homes completedflats · Aug 2025
Aug 2025 1.5 km away
New homes
52 new homes completedflats · Aug 2025
Aug 2025 1.6 km away
New homes
52 new homes completedflats · Aug 2025
Aug 2025 1.6 km away
New homes
28 new homes completedflats · Jul 2025
Jul 2025 1.2 km away
New homes
5 new homes completed1 flats, 4 houses · Jul 2025
Jul 2025 1.2 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 61 postcodes nearby had new homes completed in the last two years.
Rooftop solar
Manchester Royal Infirmary, Oxford Road - Solar PanelsApproved, not yet built
Feb 2026 2.5 km away
Rooftop solar
Xaverian College, Lower Park Road - Solar PanelsApproved, not yet built · 170 kW
Apr 2024 2.8 km away
Running nearest: Ardwick Railway Goods Yard Incinerator (Newhaven EFW Plant) (energy from waste, 4.2 km); West Didsbury Battery Storage (battery storage, 4.4 km); Salford Refuse Treatment Plant (AD) (anaerobic digestion, 4.5 km); Outer Space Studios Solar Panels (rooftop solar, 4.5 km); City Football Academy, Ashton New Road - Solar panels (rooftop solar, 5.4 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
application due April 2027 28.4 km away
Pre-application
Hynet North West Hydrogen PipelineGas Transporter Pipe-lines · An approximate 125km pipeline centred approximately 1km south west of Lower Whitley, Cheshire
application due Dec 2027 28.4 km away
Decided
Keuper Gas Storage ProjectUnderground Gas Storage Facilities · Holford Brinefield, approximately 3km north of Middlewich, Cheshire.
decided Mar 2017 28.5 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.