What's changing near M14 5PX
Within 2 km, around Victoria Park & Longsight West in Manchester. Building, planning, schools, transport, prices and crime.
568new homes completed within 2 km, last 2 years
1,825homes given permission on brownfield sites since 2021
-3.6%like-for-like prices in Victoria Park & Longsight West, 2024 → 2025 (council +3.2%)
–crime data not published here (Greater Manchester)
On the map
New homesPlanning grantedSchool openedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
10 new homes completedflats · May 2026 – Jul 2026
Jul 2026
1.7 km away - New homes
45 new homes completedflats · May 2026
May 2026
1.7 km away - New homes
24 new homes completedflats · Apr 2026
Apr 2026
1.2 km away - New homes
20 new homes completed2 flats, 18 houses · Jul 2025 – Mar 2026
Mar 2026
150 m away - New homes
24 new homes completedflats · Mar 2026
Mar 2026
1.2 km away - New homes
8 new homes completedflats · Mar 2026
Mar 2026
1.9 km away - New homes
52 new homes completed39 flats, 13 houses · Jul 2025 – Mar 2026
Mar 2026
100 m away - New homes
8 new homes completedhouses · Oct 2025 – Nov 2025
Nov 2025
1.4 km away - New homes
68 new homes completedhouses · Nov 2024 – Nov 2025
Nov 2025
1.4 km away - New homes
32 new homes completedflats · Nov 2025
Nov 2025
1.4 km away - New homes
8 new homes completedhouses · Oct 2025
Oct 2025
1.9 km away - New homes
36 new homes completedflats · Sep 2025
Sept 2025
1.3 km away - New homes
46homes extended 2021–2025, typically adding 31 m²
153since energy certificates began (2008)
4in M14 5PX itself
- Extendedcertificate 2026
- Extendedcertificate 2021
- Extendedcertificate 2021
- Extendedcertificate 2020
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
10storm overflows within 2 km
68hours of spills in 2025 between them (typical neighbourhood: about 36)
26spill events counted
- United Utilities
Gorton Road (Lighting Tower)into Corn Brook7 spills, 27 hours in 2025
1.9 km away - United Utilities
Mount Road Combined Sewer Overflowinto Gore Brook Via Sws10 spills, 22 hours in 2025
2.0 km away - United Utilities
Beresford Road Csointo Clvrt Section Of Gore Brook3 spills, 6 hours in 2025
550 m away - United Utilities
Platt Lane Combined Sewer Overflowinto Platt Brook Via Sws1 spills, 4 hours in 2025
1.7 km away - United Utilities
Vaughan Street Csointo Clvrt Section Of Corn Brook1 spills, 4 hours in 2025
1.7 km away - United Utilities
Birch Hall Ln Thoresway Rd Csointo Gore Brook Via Sws3 spills, 3 hours in 2025
500 m away - United Utilities
Junction Of Ashton New Road Csointo Culverted Tributary Of Corn Brook1 spills, 2 hours in 2025
2.0 km away - United Utilities
161 A Dickenson Road Csointo Gore Brook0 spills, 0 hours in 2025
450 m away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
99 planned, approved or being built and 15 running (119 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Xaverian College, Lower Park Road - Solar PanelsApproved, not yet built · 170 kW
Apr 2024
750 m away - Rooftop solar
Manchester Royal Infirmary, Oxford Road - Solar PanelsApproved, not yet built
Feb 2026
1.3 km away - Rooftop solar
Manchester Academy, Moss Lane East - Solar PanelsApproved, not yet built · 170 kW
Dec 2025
1.6 km away - Rooftop solar
Manchester Academy, Moss Lane East - Solar PanelsApproved, not yet built
Aug 2023
1.6 km away - Rooftop solar
Co Op Academy Belle Vue, Hyde Road - Solar PanelsApproved, not yet built · 160 kW
Feb 2026
1.7 km away - Rooftop solar
Royal Northern College Of Music, Oxford Road - Solar Photovoltaic panelsBeing built · 170 kW
Jul 2022
2.2 km away - Rooftop solar
Ashton Old Road - Solar PanelsApproved, not yet built · 390 kW
Jun 2022
2.3 km away - Rooftop solar
Hammerstone Road Depot - Solar PanelsApproved, not yet built
Nov 2023
2.5 km away - Rooftop solar
Gorton Education Village, Wembley Road - Solar PanelsApproved, not yet built · 600 kW
Nov 2025
2.5 km away - Rooftop solar
East Manchester Academy, Grey Mare Lane - Solar PanelsApproved, not yet built · 230 kW
Sept 2025
2.5 km away
Road and street works within 1 km
14 permitted works running now or planned, 7 of them major.
- Major
Birch Hall Lane, ManchesterHighway improvement works · MANCHESTER CITY COUNCIL · Multi-way signals
Oct 2026 to Oct 2026
500 m away - Major, planned
Anson Road, ManchesterHighway improvement works · MANCHESTER CITY COUNCIL · Road closure
Jan 2027 to Jan 2027
500 m away - Major, planned
Stockport Road, ManchesterUtility repair and maintenance works · United Utilities Water Ltd · Some carriageway incursion
Nov 2026 to Nov 2026
550 m away - Major
Aylesford Road, ManchesterHighway improvement works · MANCHESTER CITY COUNCIL · Road closure
Sept 2026 to Oct 2026
650 m away - Major
Langport Avenue, ManchesterUtility asset works · CADENT GAS LIMITED · Some carriageway incursion
Sept 2026 to Nov 2026
900 m away - Major, planned
Wilmslow Road, ManchesterUtility asset works · BT · Multi-way signals
Jan 2027 to Jan 2027
950 m away - Major
Milnthorpe Way, ManchesterUtility asset works · CADENT GAS LIMITED · Some carriageway incursion
Oct 2026 to Oct 2026
950 m away - Minor
Ingoldsby Avenue, ManchesterRemedial works · United Utilities Water Ltd · Some carriageway incursion
Oct 2026 to Oct 2026
300 m away - Minor
Stockport Road, ManchesterRemedial works · United Utilities Water Ltd · Some carriageway incursion
Oct 2026 to Oct 2026
650 m away
Major infrastructure projects within 30 km
- Decideddecided Sept 2025
10.8 km away - Decideddecided Nov 2022
13.6 km away - Decideddecided Aug 2014
18.0 km away - Pre-application
Intermodal Logistics Park NorthRail Freight Interchanges · Site known as Intermodal Logistics Park North – land bounded by the M6 motorway (west), Winwick Lane (south and east) and Chat Moss railway line (north). application due May 2027
24.9 km away - Pre-application
Peak Cluster CCS PipelineOther Pipe-lines · A carbon dioxide transport pipeline network connecting carbon capture sites in Derbyshire, Staffordshire and Cheshire to a coastal location on the Wirral peninsula application due September 2027
28.0 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Outer Space Studios Solar Panels (rooftop solar, 1.6 km); Ardwick Railway Goods Yard Incinerator (Newhaven EFW Plant) (energy from waste, 1.9 km); Tesco Super-Store (Garratt Way, Gorton) (rooftop solar, 2.5 km); City Football Academy, Ashton New Road - Solar panels (rooftop solar, 3.0 km); The National Cycling Centre Velodrome (rooftop solar, 3.4 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.