Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
9storm overflows within 2 km
41hours of spills in 2025 between them (typical neighbourhood: about 36)
19spill events counted
United Utilities
Mount Road Combined Sewer Overflowinto Gore Brook Via Sws10 spills, 22 hours in 2025
1.8 km away
United Utilities
Beresford Road Csointo Clvrt Section Of Gore Brook3 spills, 6 hours in 2025
350 m away
United Utilities
Platt Lane Combined Sewer Overflowinto Platt Brook Via Sws1 spills, 4 hours in 2025
1.7 km away
United Utilities
Vaughan Street Csointo Clvrt Section Of Corn Brook1 spills, 4 hours in 2025
1.7 km away
United Utilities
Birch Hall Ln Thoresway Rd Csointo Gore Brook Via Sws3 spills, 3 hours in 2025
250 m away
United Utilities
Junction Of Ashton New Road Csointo Culverted Tributary Of Corn Brook1 spills, 2 hours in 2025
2.0 km away
United Utilities
161 A Dickenson Road Csointo Gore Brook0 spills, 0 hours in 2025
350 m away
United Utilities
Mad Hatter Pubinto Gore Brook0 spills, 0 hours in 2025
Intermodal Logistics Park NorthRail Freight Interchanges · Site known as Intermodal Logistics Park North – land bounded by the M6 motorway (west), Winwick Lane (south and east) and Chat Moss railway line (north).
application due May 2027 25.1 km away
Pre-application
Peak Cluster CCS PipelineOther Pipe-lines · A carbon dioxide transport pipeline network connecting carbon capture sites in Derbyshire, Staffordshire and Cheshire to a coastal location on the Wirral peninsula
application due September 2027 28.0 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Victoria Park & Longsight West: +16% over five years (2020 → 2025).
Council tax list: 40 homes added in the neighbourhood since April 2024.
Population (GP registrations): -2.1% in two years.