Country England and Wales › Region North West › Council Manchester › Neighbourhood Beswick, Eastlands & Openshaw Park › Postcode M11 4HD What's changing near M11 4HD Within 2 km, around Beswick, Eastlands & Openshaw Park in Manchester. Building, planning, schools, transport, prices and crime.
148 new homes completed within 2 km, last 2 years
787 homes given permission on brownfield sites since 2021
-0.2% like-for-like prices in Beswick, Eastlands & Openshaw Park, 2024 → 2025 (council +3.2%)
– crime data not published here (Greater Manchester)
On the map
New homes Planning granted School opened Extended home Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New school New school: Ravensbury Community School Academy sponsor led, primary
planned Apr 2027 350 m away New homes 10 new homes completed houses · Aug 2026
Aug 2026 1.6 km away New homes 21 new homes completed houses · May 2025 – Sep 2025
Sept 2025 1.3 km away New homes 6 new homes completed flats · Sep 2025
Sept 2025 1.3 km away New homes 6 new homes completed flats · Sep 2025
Sept 2025 1.3 km away New homes 6 new homes completed flats · Sep 2025
Sept 2025 1.3 km away New homes 6 new homes completed flats · Sep 2025
Sept 2025 1.2 km away New homes 6 new homes completed flats · Sep 2025
Sept 2025 1.2 km away New homes 6 new homes completed flats · Sep 2025
Sept 2025 1.2 km away New homes 6 new homes completed flats · Sep 2025
Sept 2025 1.2 km away New homes 12 new homes completed 4 flats, 8 houses · May 2025 – Jun 2025
Jun 2025 950 m away New homes 8 new homes completed houses · Apr 2025
Apr 2025 1.2 km away New homes 6 homes extended 2021–2025, typically adding 30 m²
32 since energy certificates began (2008)
3 in M11 4HD itself
Extended certificate 2021 Extended certificate 2019 Extended certificate 2014 Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km 14 storm overflows within 2 km
288 hours of spills in 2025 between them (typical neighbourhood: about 36)
94 spill events counted
United Utilities Clayton Bridge into River Medlock 42 spills, 173 hours in 2025
1.2 km away United Utilities Failsworth Wwtw into The River Medlock 8 spills, 56 hours in 2025
1.8 km away United Utilities Gorton Road (Lighting Tower) into Corn Brook 7 spills, 27 hours in 2025
1.9 km away United Utilities Parrott Street/Bromlow Street Cso into Corn Brook Via Sws 19 spills, 23 hours in 2025
900 m away United Utilities Assheton Road Cso 281ca into Clvrt Trib Of River Mersey 11 spills, 5 hours in 2025
1.2 km away United Utilities Junction Of Ashton New Road Cso into Culverted Tributary Of Corn Brook 1 spills, 2 hours in 2025
1.8 km away United Utilities Lord North Street/Clifton St Cso into Shooters Brook 4 spills, 1 hours in 2025
1.7 km away United Utilities Junction Of Graver Ln Elsma Rd Cso into Berry Brow Culvert 1 spills, 0 hours in 2025
1.2 km away Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 100 planned, approved or being built and 15 running (120 MW between them). Those within 5 km are on the map above.
Rooftop solar The National Cycling Centre - Solar Photovoltaic Panels Being built · 920 kW
Aug 2022 600 m away Solar farm City Football Academy - Solar Panels Approved, not yet built · 1 MW
Dec 2024 900 m away Rooftop solar G H Sheldon, Stainburn Road - Solar Panels Approved, not yet built · 290 kW
Jul 2023 950 m away Rooftop solar Unit C, Kelbrook Road - Solar Panels Approved, not yet built · 610 kW
Aug 2023 1.1 km away Rooftop solar East Manchester Academy, Grey Mare Lane - Solar Panels Approved, not yet built · 230 kW
Sept 2025 1.3 km away Rooftop solar Etihad Stadium, Ashton New Road - Solar Panels Approved, not yet built · 220 kW
May 2025 1.4 km away Rooftop solar Ashton Old Road - Solar Panels Approved, not yet built · 390 kW
Jun 2022 1.5 km away Rooftop solar New Smithfield Market, Whitworth Street East -Solar Panels Approved, not yet built · 270 kW
Dec 2024 1.6 km away Rooftop solar New Smithfield Market - Solar Panels Approved, not yet built · 160 kW
Dec 2024 1.6 km away Rooftop solar Hammerstone Road Depot - Solar Panels Approved, not yet built
Nov 2023 1.9 km away Rooftop solar Road and street works within 1 km 2 permitted works running now or planned.
Minor Hackle Street, Manchester Remedial works · United Utilities Water Ltd · Some carriageway incursion
Nov 2026 to Nov 2026 400 m away Minor Edge Lane, Droylsden Disconnection or alteration of supply · United Utilities Water Ltd · Multi-way signals
Oct 2026 to Oct 2026 850 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided decided Sept 2025 8.9 km away Decided decided Nov 2022 12.1 km away Decided decided Aug 2014 21.6 km away Pre-application Intermodal Logistics Park North Rail Freight Interchanges · Site known as Intermodal Logistics Park North – land bounded by the M6 motorway (west), Winwick Lane (south and east) and Chat Moss railway line (north). application due May 2027 27.1 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: The National Cycling Centre Velodrome (rooftop solar, 700 m); City Football Academy, Ashton New Road - Solar panels (rooftop solar, 900 m); Reliance Street Mechanical Biological Treatment Facility (MBT) (anaerobic digestion, 2.1 km); Ardwick Railway Goods Yard Incinerator (Newhaven EFW Plant) (energy from waste, 2.1 km); Outer Space Studios Solar Panels (rooftop solar, 2.1 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.