Country England and Wales › Region East of England › Council Luton › Neighbourhood Warden Hill › Postcode LU2 7HB What's changing near LU2 7HB Within 2 km, around Warden Hill in Luton. Building, planning, schools, transport, prices and crime.
8 new homes completed within 2 km, last 2 years
0 homes given permission on brownfield sites since 2021
+9.5% like-for-like prices in Warden Hill, 2024 → 2025 (council +3.8%)
+20% recorded crime, last 12 months vs the 12 before
On the map
New homes School opened Extended home Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New school Aug 2023 1.9 km away New-home postcodes with fewer than 5 homes are counted above but not listed. 5 postcodes nearby had new homes completed in the last two years.
11 homes extended 2021–2025, typically adding 41 m²
21 since energy certificates began (2008)
1 in LU2 7HB itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 22 planned, approved or being built and 11 running (158 MW between them). Those within 5 km are on the map above.
Rooftop solar Luton Sixth Form College, Bradgers Hill Road - Solar Panels Approved, not yet built · 300 kW
Feb 2023 1.7 km away Rooftop solar Butterfied Business Park, Great Marlings - Solar Panels Approved, not yet built · 400 kW
Jan 2024 2.3 km away Rooftop solar Inspire Luton Sports Village, Butterfield Green Road - Solar Panels Approved, not yet built · 390 kW
Apr 2025 2.3 km away Rooftop solar North Luton Industrial Estate, Sedgwick Road - Solar Panels Approved, not yet built · 350 kW
Apr 2026 3.7 km away Rooftop solar Panattoni Park, Luton Road - Solar Panels Approved, not yet built · 2 MW
Apr 2025 4.3 km away Rooftop solar Luton Airport, President Way - Solar PV Panels Approved, not yet built · 480 kW
Aug 2022 5.1 km away Rooftop solar Percival Way - Solar Panels Approved, not yet built · 470 kW
Aug 2022 5.3 km away Rooftop solar The Chalk Hills Academy, Leagrave High Street - Solar Panels Approved, not yet built · 250 kW
Apr 2026 5.3 km away Battery storage Linmere Community Hall, Huckett Street - Micro Energy Storage Approved, not yet built · 200 kW
Jan 2026 5.3 km away Solar farm Wandon End - Solar Farm & Battery Storage Approved, not yet built · 50 MW
Jul 2025 5.5 km away Road and street works within 1 km 3 permitted works running now or planned, 1 of them major.
Major Links Way, Luton Highway repair and maintenance works · LUTON BOROUGH COUNCIL · Give and take
Nov 2026 to Dec 2026 100 m away Minor Barton Road, Luton Utility repair and maintenance works · AFFINITY WATER - C · Some carriageway incursion
Oct 2026 to Oct 2026 650 m away Minor Spayne Close, Luton Utility repair and maintenance works · AFFINITY WATER - C · Some carriageway incursion
Oct 2026 to Oct 2026 850 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided decided Sept 2014 5.3 km away Decided decided Apr 2025 5.8 km away Decided decided Oct 2013 6.5 km away Decided Millbrook Power Generating Stations · The Rookery Pit Near Stewartby, Bedfordshire decided Mar 2019 16.8 km away Decided decided Oct 2011 17.0 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Chapel Farm (battery storage, 5.4 km); Sundon Substation (battery storage, 5.4 km); Sundon Landfill Site (landfill gas, 5.5 km); Ld At Lawrence End Park &, Dane Street (solar farm, 6.7 km); Caddington Solar Farm (Phase 1) (solar farm, 7.0 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.