Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Caddington & Slip End: +16% over five years (2020 → 2025).
Council tax list: 40 homes added in the neighbourhood since April 2024.
Population (GP registrations): +2.2% in two years.
Inspire Luton Sports Village, Butterfield Green Road - Solar PanelsApproved, not yet built · 390 kW
Apr 2025 6.6 km away
Rooftop solar
Panattoni Park, Luton Road - Solar PanelsApproved, not yet built · 2 MW
Apr 2025 6.9 km away
Running nearest: Caddington Solar Farm (Phase 1) (solar farm, 750 m); Caddington Solar Farm (Phase 2) (solar farm, 1.2 km); Ld At Lawrence End Park &, Dane Street (solar farm, 6.7 km); Land North of Chiltern Greeen (solar farm, 6.9 km); Chapel Farm (battery storage, 7.8 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.