What's changing near LU1 1QR
Within 2 km, around New Town in Luton. Building, planning, schools, transport, prices and crime.
158new homes completed within 2 km, last 2 years
1,161homes given permission on brownfield sites since 2021
+4.3%like-for-like prices in New Town, 2024 → 2025 (council +3.8%)
-2%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedSchool openedSchool closedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
9 new homes completedflats · Oct 2026
Oct 2026
1.3 km away - New homes
6 new homes completedflats · Aug 2026
Aug 2026
1.6 km away - New homes
6 new homes completedflats · Aug 2026
Aug 2026
1.2 km away - New homes
6 new homes completedflats · May 2026
May 2026
1.0 km away - New homes
27 new homes completedflats · Nov 2025
Nov 2025
1.5 km away - New homes
67 new homes completedflats · Sep 2025
Sept 2025
950 m away - New homes
8 new homes completedflats · Aug 2025
Aug 2025
1000 m away - Planning permissionApr 2024
1.4 km away - Planning permissionFeb 2024
1000 m away - Planning permission
39homes extended 2021–2025, typically adding 24 m²
86since energy certificates began (2008)
4in LU1 1QR itself
- Extendedcertificate 2018
- Extendedcertificate 2010
- Extendedcertificate 2010
- Extendedcertificate 2009
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
19storm overflows within 2 km
86hours of spills in 2025 between them (typical neighbourhood: about 36)
38spill events counted
- Thames Water
N/Ainto Not Applicable12 spills, 79 hours in 2025
900 m away - Thames Water
N/Ainto Not Applicable20 spills, 6 hours in 2025
1.6 km away - Thames Water
N/Ainto Not Applicable2 spills, 1 hours in 2025
800 m away - Thames Water
N/Ainto Not Applicable1 spills, 0 hours in 2025
1.6 km away - Thames Water
N/Ainto Not Applicable2 spills, 0 hours in 2025
800 m away - Thames Water
N/Ainto Not Applicable1 spills, 0 hours in 2025
800 m away - Thames Water
Cso At New Bedford Roadinto River Lee0 spills, 0 hours in 2025
750 m away - Thames Water
N/Ainto Not Applicable0 spills, 0 hours in 2025
750 m away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
21 planned, approved or being built and 7 running (120 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Astrazeneca UK, Capability Green - Solar PanelsApproved, not yet built · 460 kW
Feb 2026
2.0 km away - Rooftop solar
Luton Sixth Form College, Bradgers Hill Road - Solar PanelsApproved, not yet built · 300 kW
Feb 2023
2.9 km away - Rooftop solar
Percival Way - Solar PanelsApproved, not yet built · 470 kW
Aug 2022
3.5 km away - Rooftop solar
Luton Airport, President Way - Solar PV PanelsApproved, not yet built · 480 kW
Aug 2022
3.9 km away - Rooftop solar
Inspire Luton Sports Village, Butterfield Green Road - Solar PanelsApproved, not yet built · 390 kW
Apr 2025
4.1 km away - Solar farm
Watling Street, Caddington - Solar FarmApproved, not yet built · 20 MW
Aug 2025
4.3 km away - Rooftop solar
Butterfied Business Park, Great Marlings - Solar PanelsApproved, not yet built · 400 kW
Jan 2024
4.4 km away - Rooftop solar
The Chalk Hills Academy, Leagrave High Street - Solar PanelsApproved, not yet built · 250 kW
Apr 2026
4.8 km away - Rooftop solar
North Luton Industrial Estate, Sedgwick Road - Solar PanelsApproved, not yet built · 350 kW
Apr 2026
5.3 km away - Solar farm
Wandon End - Solar Farm & Battery StorageApproved, not yet built · 50 MW
Jul 20255.6 km away
Road and street works within 1 km
12 permitted works running now or planned, 7 of them major.
- Major, planned
Dunstable Road, LutonUtility repair and maintenance works · THAMES WATER · Road closure
Nov 2026 to Nov 2026
450 m away - Major
Dunstable Road, LutonUtility repair and maintenance works · THAMES WATER · Road closure
Nov 2026 to Nov 2026
450 m away - Major, planned
Windsor Walk, LutonNew service connection · CADENT GAS LIMITED · Road closure
Nov 2026 to Nov 2026
600 m away - Major, planned
New Bedford Road, LutonUtility repair and maintenance works · THAMES WATER · Road closure
Nov 2026 to Nov 2026
750 m away - Major
Chapel Street, LutonRemedial works · AFFINITY WATER - C · Road closure
Dec 2026 to Dec 2026
800 m away - Major
George Street, LutonNew service connection · AFFINITY WATER - C · Give and take
Oct 2026 to Nov 2026
900 m away - Major
Old Bedford Road, LutonUtility repair and maintenance works · THAMES WATER · Road closure
Nov 2026 to Nov 2026
900 m away - Minor
Gordon Street, LutonUtility repair and maintenance works · AFFINITY WATER - C · Some carriageway incursion
Oct 2026 to Nov 2026
650 m away - Minor
Russell Rise, LutonUtility repair and maintenance works · AFFINITY WATER - C · Some carriageway incursion
Oct 2026 to Oct 2026
700 m away - Minor
Major infrastructure projects within 30 km
- Decideddecided Oct 2013
2.3 km away - Decideddecided Apr 2025
3.8 km away - Decideddecided Sept 2014
6.0 km away - Decided
Millbrook PowerGenerating Stations · The Rookery Pit Near Stewartby, Bedfordshire decided Mar 2019
20.7 km away - Decideddecided Oct 2011
21.0 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Caddington Solar Farm (Phase 1) (solar farm, 3.2 km); Caddington Solar Farm (Phase 2) (solar farm, 3.7 km); Ld At Lawrence End Park &, Dane Street (solar farm, 4.8 km); Land North of Chiltern Greeen (solar farm, 5.5 km); Chapel Farm (battery storage, 7.2 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.