Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
6storm overflows within 2 km
151hours of spills in 2025 between them (typical neighbourhood: about 36)
79spill events counted
Yorkshire Water
Station Road No. 2 Csointo Mickle Ing Beck41 spills, 98 hours in 2025
900 m away
Yorkshire Water
Netherfield Road Csointo Mire Beck Via Sws10 spills, 22 hours in 2025
1.4 km away
Yorkshire Water
Station Road No. 2 Csointo Mickle Ing Beck15 spills, 15 hours in 2025
900 m away
Yorkshire Water
Station Road No. 2 Csointo Mickle Ing Beck9 spills, 12 hours in 2025
900 m away
Yorkshire Water
Station Road No. 2 Csointo Mickle Ing Beck4 spills, 5 hours in 2025
900 m away
Yorkshire Water
Station Road No. 2 Csointo Mickle Ing Beck0 spills, 0 hours in 2025
18 planned, approved or being built and 2 running (4 MW between them). Those within 5 km are on the map above.
Rooftop solar
Guiseley Primary School, Oxford Road - Solar PanelsApproved, not yet built · 200 kW
Jul 2024 2.6 km away
Rooftop solar
Guiseley School, Fieldhead Road - Solar PanelsApproved, not yet built · 270 kW
May 2023 2.8 km away
Rooftop solar
Wharfedale General Hospital - Solar Photovoltaic PanelsApproved, not yet built · 470 kW
Dec 2021 3.7 km away
Rooftop solar
Silvine Works - Roof Mounted Solar PanelsApproved, not yet built · 240 kW
Jan 2022 3.7 km away
Rooftop solar
Baildon CE Primary School, Coverdale Way - Solar Photovoltaic PanelsApproved, not yet built · 170 kW
Dec 2023 4.2 km away
Rooftop solar
Sapper Jordan Rossi Park, Baildon - Solar PanelsApproved, not yet built · 300 kW
Oct 2022 4.8 km away
Rooftop solar
Marston House, Otley Road - Solar PanelsApproved, not yet built · 3 MW
May 2023 5.3 km away
Rooftop solar
Benton Park School, Harrogate Road - Solar PanelsApproved, not yet built · 230 kW
Aug 2023 5.4 km away
Rooftop solar
Moorland Engineering Works, Lower Railway Road - Solar PanelsApproved, not yet built · 280 kW
Jun 2025 5.9 km away
Rooftop solar
The Waterfront, Salts Mill Road - Solar PanelsApproved, not yet built
May 20246.6 km away
Road and street works within 1 km
8 permitted works running now or planned, 5 of them major.
Major, planned
Main Street, IlkleyUtility asset works · CITY OF BRADFORD METROPOLITAN DISTRICT COUNCIL · Give and take
Oct 2026 to Nov 2026 250 m away
Major
Burley Lane, IlkleyUtility asset works · BT · Road closure
Oct 2026 to Oct 2026 550 m away
Major
Menston Old Lane, IlkleyUtility asset works · BT · Road closure
Oct 2026 to Oct 2026 650 m away
Major
Moor Lane, IlkleyHighway improvement works · CITY OF BRADFORD METROPOLITAN DISTRICT COUNCIL · Road closure
Oct 2026 to Oct 2026 700 m away
Major, planned
Derry Hill, IlkleyUtility asset works · QUICKLINE COMMUNICATIONS LTD · Road closure
Nov 2026 to Nov 2026 750 m away
Standard
Cleasby Road, IlkleyWorks for road purposes · CITY OF BRADFORD METROPOLITAN DISTRICT COUNCIL · Some carriageway incursion
Oct 2026 to Oct 2026 400 m away
Standard
Windermere Avenue, IlkleyNew service connection · NORTHERN POWERGRID (YORKSHIRE) PLC · Some carriageway incursion
Oct 2026 to Nov 2026 800 m away
Standard
Glen Mount, IlkleyNew service connection · NORTHERN POWERGRID (YORKSHIRE) PLC · Give and take
Oct 2026 to Nov 2026 850 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-application
Calderdale Energy ParkGenerating Stations · Walshaw Moor, on either side of the three Walshaw Dean Reservoirs in the Metropolitan Borough of Calderdale, West Yorkshire.
application due November 2026 22.8 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Menston & Burley Moor: +21% over five years (2020 → 2025).
Council tax list: 100 homes added in the neighbourhood since April 2024.
Population (GP registrations): +2.3% in two years.