Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
3storm overflows within 2 km
449hours of spills in 2025 between them (typical neighbourhood: about 36)
75spill events counted
Yorkshire Water
Addingham No.1 Storm Tanksinto River Wharfe · near bathing water: Wharfe at Cromwheel, Ilkley41 spills, 371 hours in 2025
1.8 km away
Yorkshire Water
Addingham No.1 Storm Tanksinto River Wharfe · near bathing water: Wharfe at Cromwheel, Ilkley28 spills, 61 hours in 2025
1.8 km away
Yorkshire Water
Low Mill Lane 179 Csointo Town Beck · near bathing water: Wharfe at Cromwheel, Ilkley6 spills, 17 hours in 2025
11 planned, approved or being built and 3 running (5 MW between them). Those within 5 km are on the map above.
Solar farm
Halton East Quarries - Solar PanelsApproved, not yet built · 650 kW
Feb 2026 5.2 km away
Rooftop solar
Moorland Engineering Works, Lower Railway Road - Solar PanelsApproved, not yet built · 280 kW
Jun 2025 5.4 km away
Rooftop solar
Riverside Business Park, Ings Avenue - Solar PV SystemApproved, not yet built · 160 kW
Jun 2025 7.5 km away
Rooftop solar
Carlton Keighley, Green Head Road - Solar ArrayApproved, not yet built · 540 kW
Nov 2024 7.6 km away
Rooftop solar
University Academy Keighley, Green Head Road - Solar PanelsApproved, not yet built · 510 kW
Apr 2025 7.6 km away
Rooftop solar
South Craven School, Holme Lane, Cross Hills - Solar panelsApproved, not yet built · 630 kW
Oct 2024 8.3 km away
Battery storage
Dalton LaneApproved, not yet built
Oct 2020 8.4 km away
Solar farm
Yorkshire Water Plc Sewage Works - Ground Mounted Solar PV DevelopmentApproved, not yet built · 380 kW
Jul 2023 8.5 km away
Rooftop solar
Dechra Pharmaceuticals Manufacturing, Building 3 - Solar PanelsApproved, not yet built · 2 MW
Sept 2022 8.5 km away
Rooftop solar
Sainsburys Centre, Cavendish Street - Solar PanelsApproved, not yet built · 720 kW
May 20268.5 km away
Road and street works within 1 km
2 permitted works running now or planned, 2 of them major.
Major, planned
Main Street, AddinghamNew service connection · NORTHERN POWERGRID (YORKSHIRE) PLC · Road closure
Feb 2027 to Feb 2027 200 m away
Major
Main Street, AddinghamNew service connection · NORTHERN POWERGRID (YORKSHIRE) PLC · Road closure
Feb 2027 to Feb 2027 200 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-application
Calderdale Energy ParkGenerating Stations · Walshaw Moor, on either side of the three Walshaw Dean Reservoirs in the Metropolitan Borough of Calderdale, West Yorkshire.
application due November 2026 19.2 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Addingham & Ilkley Moor: +16% over five years (2020 → 2025).
Council tax list: 0 homes added in the neighbourhood since April 2024.
Population (GP registrations): -0.4% in two years.