Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
11storm overflows within 2 km
386hours of spills in 2025 between them (typical neighbourhood: about 36)
227spill events counted
Yorkshire Water
Dawsons Corner Csointo Tributary Of Bagley Beck48 spills, 100 hours in 2025
1.4 km away
Yorkshire Water
Stanningley Csointo Farsley Beck (Culverted)49 spills, 68 hours in 2025
1.3 km away
Yorkshire Water
Dick Lne Cso & New Lne Spsinto Cul Trib Of Tyersal Beck19 spills, 64 hours in 2025
1.7 km away
Yorkshire Water
Lowtown Csointo Clvrtdtrib Of Pudsey Beck37 spills, 52 hours in 2025
1.5 km away
Yorkshire Water
Pudsey (Smalewell) Csointo Tyersal Beck18 spills, 44 hours in 2025
750 m away
Yorkshire Water
Houghside Road Csointo Tributary Of Pudesy Beck22 spills, 27 hours in 2025
1.7 km away
Yorkshire Water
Kent Road Csointo Tributary Of Pudsey Beck17 spills, 18 hours in 2025
1.7 km away
Yorkshire Water
Spring Valley No2 Csointo Farsley Beck16 spills, 13 hours in 2025
62 planned, approved or being built and 7 running (8 MW between them). Those within 5 km are on the map above.
Rooftop solar
New Street Mills, Carlisle Road - Solar PanelsApproved, not yet built
Oct 2025 800 m away
Rooftop solar
Pudsey Leisure Centre - Solar PanelsApproved, not yet built · 250 kW
Feb 2024 900 m away
Rooftop solar
Crawshaw Academy, Robin Lane - Solar PanelsApproved, not yet built · 200 kW
May 2023 1.3 km away
Rooftop solar
Spring Valley Mills - Solar PanelsApproved, not yet built · 380 kW
Apr 2022 1.5 km away
Rooftop solar
West Specialist Inclusive Learning Centre, Town Street - Solar PV PanelsApproved, not yet built · 240 kW
Jun 2024 2.0 km away
Biomass
Unit 1, Whitehead Business Park - Biomass BoilerApproved, not yet built · 200 kW
Jan 2024 2.6 km away
Rooftop solar
Bramley Baths, Broad Lane - Solar PanelsApproved, not yet built · 430 kW
Dec 2024 3.3 km away
Rooftop solar
Greenhill Primary School, Gamble Hill Drive - Solar PV panelsApproved, not yet built · 160 kW
May 2023 3.5 km away
Anaerobic digestion
Cashmere Works, Birksland Street - Anaerobic Digestion FacilityPlanning application in
May 2024 3.6 km away
Anaerobic digestion
Cashmere Works, Birksland Street - Anaerobic Digestion FacilityApproved, not yet built
Nov 20243.6 km away
Road and street works within 1 km
4 permitted works running now or planned, 2 of them major.
Major, planned
Cemetery Road, PudseyHighway repair and maintenance works · LEEDS CITY COUNCIL · Road closure
Oct 2026 to Oct 2026 800 m away
Major
Cemetery Road, PudseyHighway repair and maintenance works · LEEDS CITY COUNCIL · Road closure
Oct 2026 to Oct 2026 800 m away
Standard
Waterloo Road, PudseyUtility repair and maintenance works · YORKSHIRE WATER · Two-way signals
Oct 2026 to Nov 2026 950 m away
Minor
Lidget Hill, PudseyNew service connection · YORKSHIRE WATER · Multi-way signals
Oct 2026 to Oct 2026 900 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-application
Calderdale Energy ParkGenerating Stations · Walshaw Moor, on either side of the three Walshaw Dean Reservoirs in the Metropolitan Borough of Calderdale, West Yorkshire.
Ferrybridge Carbon Capture and StorageOther Pipe-lines · The Ferrybridge Energy from Waste Carbon Capture and Storage project is located near Knottingley within the City of Wakefield in West Yorkshire and administrative area of the Wakefield Metropolitan DC. The site is located to the west of the River Aire and the east of the A1(M).
application due February 2028 27.0 km away
Pre-application
Ferrybridge Next Generation Power StationGenerating Stations · Land at and within the vicinity of the former Ferrybridge C Power Station Site, Kirkhaw Lane, Ferrybridge, Knottingley, West Yorkshire – within the administrative area of Metropolitan District of Wakefield, and a land corridor extending eastwards into the administrative area of North Yorkshire Council.
application due June 2027 27.5 km away
Decided
Yorkshire GREENElectric Lines · Approximately 2km to the north west of York, extending 36km south to Monk Fryston substation
decided Mar 2024 28.8 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Pudsey South West: +37% over five years (2020 → 2025).
Council tax list: 40 homes added in the neighbourhood since April 2024.
Population (GP registrations): +0.1% in two years.